Object Type: Folder
In root of archive
2 drawings from the Great Western Railway Corsham Contract by the said railway company. Showing station plans. Designed by Isambard Kingdom Brunel.
1835-1850
10 drawings from the Great Western Railway Oxford Branch Contract by the said railway company. Showing bridges.
1853-1857
8 drawings and one contract from the Great Western Railway Contract 3C between the said railway company and Edward Price showing the line passing through Langley Burrell to Sutton Benger. Designed by Isambard Kingdom Brunel.
17 June 1839
35 drawings and one contract from the Great Western Railway Pangbourn Contract between the said railway company and Messrs Grissell and Peto from the Parish of Basildon to Tilehurst. Designed by Isambard Kingdom Brunel.
08 September 1838
3 drawings from the Cheltenham and Great Western Union Railway Contract No.1 Sapperton Tunnel, showing bridges, embankments, culverts and tunnels. Made between the said railway company and Messrs Ritson and Fowler. Designed by Isambard Kingdom Brunel.
25 February 1839
42 drawings from the Great Western Railway Contract 8L by the said railway company. Showing bridges, embankments, cuttings and culverts. Designed by Isambard Kingdom Brunel.
1835-1845
Seven drawings on one sheet. First drawing is of elevation of bridge with trains passing over, second drawing is of plan of superstructure, third drawing is of section longitudinally, fourth drawing is of section at centre of main pier, fifth drawing is of section at 144ft arch, sixth drawing is of section at 100ft arch, seventh drawing is of section at centre of 20ft arch. Consulting engineer: J Walker esq., engineer: TE Harrison esq., Drawing drawn by David Bremner.
1834-1838
19 drawings and one contract from the Great Western Railway Contract 4R between the said railway company and James Thomas Bedborough from the Parish of Dudcot to Cholsey. Designed by Isambard Kingdom Brunel.
30 April 1838
23 drawings from the Wilts Somerset and Weymouth Railway Bruton Deviation Contract showing bridges and culverts
1845-1860
49 drawings from the South Eastern Railway, the London Brighton and South Coast Railway and the Southern Railway showing London Bridge Station.
1836-1978
14 drawings and one contract from the South Wales Railway Contract No.3 between the said railway company and Robert Sharpe showing bridges, embankments, cuttings and culverts. Designed by Isambard Kingdom Brunel.
01 December 1846
12 drawings and one contract from the South Wales Railway Contract No.1 [Swansea] showing bridges, embankments and culverts. Made between the said railway company and Mr John Sharpe. Designed by Isambard Kingdom Brunel.
31 October 1846
Four drawings. Great Western Railway Contract 15B provided a Tunnel through Middle Hill near Box, Wiltshire. It was designed by Isambard Kingdom Brunel and built by George Findlater in January 1840.
11 January 1840
14 drawings from the Cheltenham and Great Western Union Railway Contract No.2CR between the said railway company and Messrs Oldham showing bridges, embankments, cuttings and culverts. Designed by Isambard Kingdom Brunel.
[1838-1845]