search archive
browse archive Up

055/056/057/058/059/060 - Great Western Railway Paddington Station [New Station]

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoes and plan. Drawing is signed by Lancaster Owen.

27 May 1878

Paddington Station Additional Offices. Six drawings on one sheet. First drawing is of cast iron column and key plan, second drawing is of elevation, third drawing is of sectional plan of base and columns, fourth drawing is of plan section AB, fifth drawing is of plan on top, sixth drawing for section AB. Drawing is signed by Lancaster [Owen].

27 May 1878

Paddington Station Proposed Alterations. Drawing is of proposed alterations for the position of lines at Paddington Station as well as a proposed new departure platform. Drawing also contains details of an approximate estimate for new platforms, lines, crossings, switches, signals and general alterations.

29 March 1884

Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoes and plan. Drawing is signed by Lancaster O[wen].

05 June 1878

Paddington Station. Five drawings on one sheet. First drawing is of a plan showing subway, second drawing is of section thro' subway under rails, third drawing is of cross section thro' stairs, fourth drawing is of longitudinal section of stairs, fifth drawing is of detail of rail bearer.

11 February 1889

Paddington Station Additional Offices. Six drawings on one sheet. First drawing is of cast iron column and key plan, second drawing is of elevation, third drawing is of sectional plan of base and columns, fourth drawing is of plan section AB, fifth drawing is of plan on top, sixth drawing for section AB. Drawing is signed by Lancaster Owen.

25 May 1878

Paddington Station Additional Offices. Eleven drawings on one sheet. Drawings include elevations and plans of girders, plates, section of floor and arrangements of bolts. Drawing is signed by Lancaster Owen.

05 June 1878

Paddington Station. Two drawings on one sheet. First drawing is of second floor plan for offices, second drawing is of first floor plan for offices.

1855-1890

Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and sectional plans of girders, plates, floor and details of brackets. Drawing is signed by Lancaster Owen.

27 May 1878

Paddington Station Alterations. Sixteen drawings of details of purlins at ridge. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Twelve drawings on one sheet of details of new main roof. Drawings include cross sections, sections and details. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Twenty four drawings on one sheet of various sections and details of screen to west end of main roof. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Nine drawings on one sheet of various details, sections and elevations for details of roof including details of gutters. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station. Three drawings on one sheet for foundations for 70 feet engine transverser Paddington Station, Swindon August 1912. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Sixteen drawings on one sheet of various details and elevations for details of new main roof. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Twenty one drawings on one sheet for details of new main roof. Drawings include sectional plans and details. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Twenty three drawings on one sheet. Inside of end elevation showing tracery decoration of end screen. Aslo shows half plan of top and bottom flange of screen girder.

29 December 1914

Paddington Station Alterations. Eighteen drawings on one sheet including sections and details of new roof girder 60 ft span in lieu of existing 60ft girder. Drawing is signed by Mr. Gleadow.

23 August 1915

Powered by Preservica
Copyright © Network Rail