Object Type: Folder
In Folder: Historical Engineering Collection
Seven drawings on one sheet. First drawing is of section of culvert, second drawing is of section of diversion of Walsden Brooke along the line D.E.F, third drawing is of longitudinal section shewing weir, fourth drawing is of a plan showing diverted course of river, fifth drawing is of section of the calder along the line C.E, sixth drawing is of cross section above the weir, seventh drawing is of cross section below the weir. Signed by I C Forsyth.
1836-1847
Drawing of the elevation of the concave front of Todmorden Viaduct, signed by Thomas Gooch
Undated, circa 1836-1840
Plan of the Todmorden Contract section of the Manchester and Leeds Railway, with details of Parishes and Landowners
Undated, circa 1836-1841
Drawings of permanent fencing, including section of ditch and bank, section of drain tile, elevation of posts and railing on approaches to bridges, and section of an embankment forming an approach to a bridge. Signed by Engineer Thomas Longridge Gooch, and contractors Mark and Charles Faviell, and engineer I C Forsyth
No date, circa 1838-1839
Four drawings of permanent fencing; section of a ditch and bank, elevation of posts and railing on approaches to bridges, section of an embankment forming an approach to a bridge, and cross section of a diverted road showing fencing. Signed by contractor John Woodward and engineer Thomas Longridge Gooch, and engineer I C Forsyth
No date, circa 1838-1839
Drawings of permanent fences, including section of a ditch and band, section of a drain tile, elevation of posts and railing on approaches to bridges, section of an embankments forming an approach to a bridge, and a cross section of a diverted road showing fencing. Signed by engineer Thomas Longridge Gooch, contractors J B Faviell and Mark Faviell, and contractor I C Forsyth
No date, circa 1838-1839
Nine generic drawings for the Rastrick contract, including sections of cuttings, embankments, retaining wall, fence wall, fencing and gates, and drain. Signed by contractor John Woodward and engineer Thomas Longridge Gooch, and engineer I C Forsyth
No date, circa 1838-1839
Drawings for permanent fencing, including section of ditch and bank, elevation of posts and railing on approach to bridges, section of an embankment forming an approach to a bridge and cross section of a diverted road showing fencing. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Drawings for the bridge over Elland Cut - longitudinal section on the skew, and plan above the string course and at the footings. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Drawings for the bridge over the River Calder at Elland, including section, cross section and half longitudinal sections. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Elevation for bridge over the River Calder at Elland. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Various drawings, including sections of cuttings, section of enbankment, elevation of fence gates and railings, gate, fence wall and retaining wall. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth. Section of drawing missing on right hand side.
No date, circa 1838-1839
Drawings for level crossings, including sections and plans, Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Cross sections of diversion of Turnpike Road to Elland, at Long Lees Cut. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Four drawings of the Sowerby Bridge Tunnel entrance - elevation, section through tunnel entrance, plan, and detail of the projecting battlement. Signed by engineer Thomas Longridge Gooch and Joseph Fraser, and I C Forsyth
No date, circa 1838-1839
Drawings for the bridge over Elland Cut and Turnpike Road, including elevation and cross sections. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Drawings for bridge over Ellend Cut, including longitudinal sections and cross sections. Signed by engineer Thomas, Longridge Gooch and contractor James Jennings, and engineer I C Forsyth
No date, circa 1838-1839
Elevation of the concave front of Gauxholme Viaduct. Signed by engineer Thomas, Longridge Gooch and contractor James Nowill, and engineer I C Forsyth
No date, circa 1838-1839