search archive
browse archive Up

065 - Great Western Railway - Tilehurst Station

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Drawing is plan of station layout showing new waiting room and ladies on centre platform. Signed by J C Inglis, Chief Engineer [J & R] Watt.

22 November 1893

Drawing has several drawings on one sheet. These are of details of wrought iron cantilevers. Signed by J C Inglis and [J & R] Watt.

22 November 1893

Four drawings on one sheet. First drawing is of longitudinal section, second drawing is of section through passage central platform, third drawing is section through waiting room and central platform, fourth drawing is general plan. Signed by J C Inglis and [J&R] Watt.

22 November 1893

Seven drawings on one sheet. First drawing is of elevation to footbridge towards Paddington, second drawing is of elevation of footbridge towards Bristol, third drawing is towards down relief line, fourth drawing is of section thro' ladies, central platform, fifth drawing is of end elevation of urinals, centre platform, sixth drawing is of elevation towards approach, seventh drawing is of elevation towards down main line. Signed by J C Inglis, Chief Engineer and [J & R] Watt.

22 November 1893

Eleven drawings on one sheet. First drawing is of plan top of cap, second drawing is of plan at AA, third drawing is of elevation of chimney stack, fourth drawing is of elevation of plan of screen to urinals, centre platform, fifth drawing is of section, sixth drawing is of detail of fireplaces, seventh drawing is of section thro' capping to partition of W.C ladies lobby, eighth drawing is of section thro' capping to wall between urinals and W.C, ninth drawing is of elevation of gates, tenth drawing is of fencing to goods shed platform, eleventh drawing is of a plan. Signed by J C Inglis and [J & R] Watt.

22 November 1893

Four drawings on one sheet. First drawing is of Hartley's rolled plate glass, second drawing is of half section thro' platform covering centre platform and half section thro' ladies platform, third drawing is of elevation of vallance, full size detail of sashbars at A. Signed by J C Inglis, Chief Engineer and [J & R] Watt.

22 November 1893

Four drawings on one sheet. First drawing is of roof plan, second drawing is of back elevation of waiting shed up relief line, third drawing is of elevation towards rails up relief line, fourth drawing is of section through waiting shed shewing new store. Signed by J C Inglis [J & R] Watts.

22 November 1893

Five drawings on one sheet. First drawing is of section thro' ventilator over urinals, centre platform, second drawing is of elevation, third drawing is of column E, fourth drawing is of detail of sashbars, fifth drawing is of plan showing Hartley's Rolled Ribbed Plate Glass.

22 November 1893

Ten drawings on one sheet. First drawing is of shutter to ladies W.C and lavatory windows, second drawing is of detail of cast iron collar to wrought iron flue pipe to store in waiting shed, third drawing is of section thro' window, fourth drawing is of external elevation of urinal window and door, fifth drawing is of section thro' door, sixth drawing is of internal elevation of urinal window and door, seventh drawing is of elevation of waiting room door, eighth drawing is of section thro' door, ninth drawing is of plan, tenth drawing is of plan. Signed by J C Inglis, Chief Engineer and [J & R] Watt.

22 November 1893

Powered by Preservica
Copyright © Network Rail