search archive
browse archive Up

002/003 - Cheltenham and Great Western Union Railway - Contract No.2

Object Type: Folder
In Folder: Historical Engineering Drawings

▲

View Gallery

Title
Description
Date

Six drawings on one sheet. Drawing No. 6 for Contract No. 2. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at E and F, sixth drawing is of side elevation.

6/23/43, 11:00 PM

Six drawings on one sheet. Drawing No. 5, No. 13 and No. 19 for Contract No. 2. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G, sixth drawing is of side elevation.

6/23/43, 11:00 PM

Details of Cuttings and Embankments. Three drawings on one sheet. Drawing No. 3 for Contract No. 2. First drawing is of cutting no. 1, second drawing is of embankment no. 1, third drawing is of an untitled embankment.

6/23/43, 11:00 PM

Five drawings on one sheet. Drawing No. 16 for Contract No. 2. First drawing is of longitudinal section and back elevation, second drawing is of section at A, third drawing is of side elevation, fourth drawing is of plan of foundations, fifth drawing is of sections at B and C.

6/23/43, 11:00 PM

Details of Cuttings and Embankments. Three drawings on one sheet. Drawing No. 3 for Contract No. 2. First drawing is of cutting A, second drawing is of cutting B, third drawing is of embankment C.

6/23/43, 11:00 PM

Six drawings on one sheet. Drawing No. 14 for Contract No. 2. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G, sixth drawing is of side elevation.

6/23/43, 11:00 PM

Seven drawings on one sheet. Drawing No. 8 for Contract No. 2. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section at AB, fourth drawing is of sections at E and F, fifth drawing is of longitudinal section, sixth drawing is of transverse section at CD, seventh drawing is of transverse section.

6/23/43, 11:00 PM

Details of Culverts. Twenty four drawings on one sheet. Drawing No. 26 for Contract No. 2. Drawings are of elevations, plans, longitudinal sections and transverse sections.

6/23/43, 11:00 PM

Six drawings on one sheet. Drawing No. 18 for Contract No. 2. First drawing is of an elevation, second drawing is of elevation at H, third drawing is of longitudinal section and back elevation at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G, sixth drawing is of plan of foundations with plan of superstructure.

6/23/43, 11:00 PM

Powered by Preservica
Copyright © Network Rail