search archive
browse archive Up

095 - Wilts Somerset and Weymouth Railway - Trowbridge Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Five drawings on one sheet. First drawing is of section at O.P, second drawing is of experiments on strength of cast iron plates for canal aquaduct, third drawing is of sections at A, B, C, D, E, F and G, fourth drawing is of section at Q.R, fifth drawing is of plan of outlet. Signed by [James Geddes].

30 August 1848

Six drawings on one sheet. At 10 miles and 62.75 chains. First drawing is of elevation, second drawing is of back elevation, third drawing is of sections at C, D, E and F, fourth drawing is of transverse section, fifth drawing is of plan of new bridge location, sixth drawing is a plan of the superstructure and plan of the foundations. Signed R. Mantell, Nov. 1848.

November 1848

Three drawings on one sheet. First drawing is of cross section of embankment no. 1, second drawing is of cutting no. 2 and no. 3, third drawing is of cutting no. 4. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Six drawings on one sheet. At 9 miles and 70 chains. First drawing of elevation, second drawing is plan of Mortimer Street, third drawing is a back elevation, fourth drawing is section at AB, fifth drawing is a plan of superstructure with a plan of foundations, and sixth drawing is section at CD.

[29 May 1846]

Five drawings on one sheet. First drawing is of elevation, second drawing is of back view, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of longitudinal section, fifth drawing is of transverse section. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness. Alterations showed in dark brown and initialled by IKB and MC.

29 May 1846

Six drawings on one sheet. At 9 miles and 79.50 chains. First drawing of elevation, second drawing of back elevation, third drawing is a plan of New Road, fifth drawing is a plan of foundations, fifth drawing is of a section of bridge, sixth drawing is of the plans of the superstructure. R. Mantell, February 1848.

February 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of back elevation, third drawing is of section at E, fourth drawing is of plan, fifth drawing is of sections at F, G and H, sixth drawing is of section at A.B, seventh drawing is of section at C.D. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

One drawing showing plan of three bridges crossing the Kennet and Avon Canal.

29 May 1846

Six drawings on one sheet. At 10 miles and 20.40 chains. First drawing is of elevation, second drawing is of back elevation, third drawing is of plan of new bridge location, fourth drawing is a cross section, fifth drawing is of the plan of the foundations, and sixth drawing is the plan of the superstructure.

December 1848

Eight drawings on one sheet. First drawing of elevation, second drawing of longitudinal section AB, third drawing "to be cambered 2 inches in framing," fourth drawing is end view of wingwall, fifth drawing is small plan of section, sixth drawing is a plan of superstructure, seventh drawing is of transverse section CD, and eighth drawing is of side elevation. Signed by Henry D Oliver and Charles Lewis Phillips.

1845-1850

Six drawings on one sheet. At 7 miles and 65 chains. First drawing of elevation, second drawing of section at CD and back elevation, third drawing of sections at E, F and G, fourth drawing is a plan of foundations, fifth drawing is section at AB and sixth drawing is plan of superstructure. R. N. Mantell, Nov. 1847

November 1847

Six drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of sections at A, B, C and D, fifth drawing is of longitudinal section, sixth drawing is of back view. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

One drawing showing cross section and elevation for contract no. 2. Signed by Isambard Kingdom Brunel and Matthew Craufurd.

29 May 1846

Five drawings on one sheet. First drawing is of transverse section at L.M, second drawing is of south elevation, third drawing is of north elevation, fourth drawing is of back elevation, fifth drawing is of back elevation. Signed by James Geddes.

29 May 1846

Seven drawings on one sheet. First drawing is of elevation, second drawing is of section of retaining wall, third drawing is of transverse section, fourth drawing is of longitudinal section, fifth drawing is of section of retaining wall, sixth drawing is of plan of superstructure and plan of foundations, seventh drawing is of section of retaining wall. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Sixteen drawings on one sheet. Drawings one to four are of elevations, drawings five to eight are of transverse sections, drawings nine to twelve are of longitudinal sections, drawings thirteen to sixteen are of plans. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness. 1ft, 1ft 6", 2ft, 3ft and 3ft 6" culverts.

29 May 1846

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of plan, fourth drawing is of sections at A, B and C, fifth drawing is of transverse section, sixth drawing is of back elevation. This drawing also shows alterations shaded pink initialled by IKB and MC. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Seven drawings on one sheet. First drawing is of plan looking up at E, second drawing is of section at A.B, third drawing is of elevation of side plate, fourth drawing is of elevation, fifth drawing is of plan, sixth drawing is of section at C.D, seventh drawing is of section of side plate. Signed by James Geddes.

03 August 1848

Powered by Preservica
Copyright © Network Rail