search archive
browse archive Up

095 - Wilts Somerset and Weymouth Railway - Trowbridge Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Three drawings on one sheet. First drawing is of cross section of embankment no. 1, second drawing is of cutting no. 2 and no. 3, third drawing is of cutting no. 4. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Five drawings on one sheet. First drawing is of transverse section at L.M, second drawing is of south elevation, third drawing is of north elevation, fourth drawing is of back elevation, fifth drawing is of back elevation. Signed by James Geddes.

29 May 1846

Six drawings on one sheet. At 9 miles and 32.30 chains. First drawing of elevation, second drawing of section at AB, third drawing at sections E and F, fourth drawing an elevation, fifth drawing is plan of superstructure and plan of foundations, drawing six is a side elevation.

13 October 1848

Six drawings on one sheet. At 10 miles and 62.75 chains. First drawing is of elevation, second drawing is of back elevation, third drawing is of sections at C, D, E and F, fourth drawing is of transverse section, fifth drawing is of plan of new bridge location, sixth drawing is a plan of the superstructure and plan of the foundations. Signed R. Mantell, Nov. 1848.

November 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of back elevation, third drawing is of section at C, fourth drawing is of plan, fifth drawing is of sections at D, E and F, sixth drawing is of transverse section, seventh drawing is of longitudinal section. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Six drawings on one sheet. At 9 miles and 70 chains. First drawing of elevation, second drawing is plan of Mortimer Street, third drawing is a back elevation, fourth drawing is section at AB, fifth drawing is a plan of superstructure with a plan of foundations, and sixth drawing is section at CD.

[29 May 1846]

Six drawings on one sheet. At 9 miles and 55 chains. First drawing of elevation, second drawing of plan of superstructure, third drawing of longitudinal section, fourth drawing of transverse section, fifth drawing is a plan of foundations, and sixth drawing is a side elevation. Signed by Isambard Kingdom Brunel.

29 May 1846

Six drawings on one sheet. At 7 miles and 65 chains. First drawing of elevation, second drawing of section at CD and back elevation, third drawing of sections at E, F and G, fourth drawing is a plan of foundations, fifth drawing is section at AB and sixth drawing is plan of superstructure. R. N. Mantell, Nov. 1847

November 1847

Seven drawings on one sheet. First drawing is of elevation, second drawing is of back elevation, third drawing is of section at E, fourth drawing is of plan, fifth drawing is of sections at F, G and H, sixth drawing is of section at A.B, seventh drawing is of section at C.D. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Six drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of sections at A, B, C and D, fifth drawing is of longitudinal section, sixth drawing is of back view. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

This indenture made the twenty ninth day of May in the year one thousand eight hundred and forty six between the Wilts, Somerset and Weymouth Railway Company established and incorporated by an Act of Parliament on the one part and Matthew Craufurd. Signed by Matthew Craufurd. Trowbridge Contract.

29 May 1846

Seven drawings on one sheet. First drawing is of elevation, second drawing is of section of retaining wall, third drawing is of transverse section, fourth drawing is of longitudinal section, fifth drawing is of section of retaining wall, sixth drawing is of plan of superstructure and plan of foundations, seventh drawing is of section of retaining wall. Signed by Isambard Kingdom Brunel, Matthew Craufurd and a witness.

29 May 1846

Six drawings on one sheet. At 10 miles and 34 chains. First drawing is of elevation, second drawing is of back elevation, third drawing is of plan of new bridge location, fourth drawing is a cross section, fifth drawing is of the plan of the foundations, and sixth drawing is the plan of the superstructure. Signed Reginald Mantell, 1848.

December 1848

Seven drawings on one sheet. First drawing is of plan looking up at E, second drawing is of section at A.B, third drawing is of elevation of side plate, fourth drawing is of elevation, fifth drawing is of plan, sixth drawing is of section at C.D, seventh drawing is of section of side plate. Signed by James Geddes.

03 August 1848

Seven drawings on one sheet. First drawing of elevation, second drawing of longitudinal section AB, third drawing "to be cambered 2 inches in framing," fourth drawing is end view of wingwall, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is transverse section and seventh section is [side elevation].

1845-1850

Powered by Preservica
Copyright © Network Rail