search archive
browse archive Up

075 - Bristol and Exeter Railway Contract 2T

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Three drawings on one sheet. Drawing No. 2 for Contract No. 2T. First drawing is of elevation on the skew, second drawing is of section at AB, third drawing is of plan of foundations and plan of superstructure. Drawing is signed by Richard Hill, George Hill and I K Brunel.

02 December 1839

Drawing No. 1 for Contract No. 2T. Drawing is of a plan of the line passing by the River Avon. Drawing is signed by Richard Hill, George Hill and Brunel.

02 December 1839

Four drawings on one sheet. First drawing is of an elevation, second drawing is of section on line AB, third drawing is of section at EF (skew), fourth drawing is of plan of foundations with plan of superstructure. Drawing is signed by Richard Hill, George Hill and I K Brunel.

02 December 1839

Document is indenture made in 1839 between the Bristol and Exeter Railway Company on the one part and Richard Hill and George Hill of the city of Bristol, on the other. Contract includes information for the schedule of the works to take place and a description of the works to take place. Document is signed by Richard and George Hill.

02 December 1839

Powered by Preservica
Copyright © Network Rail