search archive
browse archive Up

066 - Great Western Railway - Swindon Station

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Four drawings on one sheet. First drawing is of an exterior of gables, second drawing is of an interior of gable, third drawing is of a section of gable, fourth drawing is of an exterior of gable.

06 June 1855

Six drawings on one sheet. First drawing is of section at timber shed, second drawing is of section at AA, third drawing is of end elevation, fourth drawing is of elevation and longitudinal section of three end bays, fifth drawing is of an elevation, sixth drawing is of plan of track.

03 September 1881

Six drawings on one sheet. First drawing is of section at timber shed, second drawing is of section at AA, third drawing is of end elevation, fourth drawing is of elevation and longitudinal section of three end bays, fifth drawing is of an elevation, sixth drawing is of plan of track.

[03 September 1881]

Two drawings on one sheet. Appears to be a draft version of drawing No. 2 of Swindon Refreshment Rooms.

1835-1845

Six drawings on one sheet for sorting room enlargement. First drawing is of elevation to roadway, second drawing is of cross section, third drawing is of elevation to [railway], fourth drawing is of plan of layout of inside of building including sorting room, lobby, office, station master's room and telegraph office, fifth drawing is of cellar plan, sixth drawing is of end elevation. Drawing is signed by Samuel Robertson and a witness.

12 March 1883

Four drawings on one sheet. First drawing is of section in line AB, second drawing is of transverse section, third drawing is of plan of framing, fourth drawing is of front elevation of Platform. Drawing is signed but signature illegible.

23 May 1856

Drawing is of a plan for the reconstruction of platform at station.

1845-1880

Three drawings on one sheet of plans and elevations relating to Swindon Station.

1845-1880

Three drawings on one sheet. First drawing is of plan, second drawing is of longitudinal section, third drawing is of transverse section.

09 September 1856

Three drawings on one sheet showing plan, longitudinal and transverse sections of platform reconstruction

1845-1880

Powered by Preservica
Copyright © Network Rail