081 - Oxford Worcester and Wolverhampton Railway - Moreton Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Thirteen drawings on one sheet. First drawing is a plan of superstructure, second is a transverse section at CD, third to thirteenth are sections of buttresses. Signed J G Thomson.

27 June 1847

Eight drawings on one sheet. First drawing is of elevation, second drawing is of section at K, third drawing is of longitudinal section at A.B, fourth drawing is of plan of foundations at level of rails and plan of superstructure, fifth drawing is of transverse section at C.D, sixth drawing is of section at E.F, seventh drawing is of side elevation, eighth drawing is of sections at G, H and I.

[14 February 1847]

Twelve drawings on one sheet of culverts. First drawing is of elevation, second drawing is of transverse section, third drawing is of longitudinal section, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of elevation, sixth drawing is of transverse section, seventh drawing is of longitudinal section, eighth drawing is of plan of foundations and plan of superstructure, ninth drawing is of elevation, tenth drawing is of plan of superstructure and plan of foundations, eleventh drawing is of longitudinal section, twelfth drawing is of transverse section.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at K.L and plan of superstructure, fourth drawing is of side elevation, sixth drawing is of transverse section at C.D, seventh drawing is of sections at E, F, G, H and I. Signed by J G Thomson.

27 June 1847

Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of end elevation, third drawing is of transverse section at C.D.

27 June 1847

Three drawings on one sheet. First drawing is of elevation, second drawing is of side elevation, third drawing is of longitudinal section at A.B. Signed by J G Thomson.

27 June 1847

Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section at A.B, sixth drawing is of plan of superstructure and plan of foundations, seventh drawing is of transverse section at C.D, eighth drawing is of elevation.

[14 February 1847]

Eight drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of transverse section at E, third drawing is of elevation of tressel, fourth drawing is of plan of superstructure and plan of foundations at H.I, fifth drawing is of casting at I, sixth drawing is of casting at K, seventh drawing is of elevation of tressel, eighth drawing is of sections at F.G.

27 June 1847

One drawing on sheet showing [transverse section of tunnel].

20 November 1848

Five drawings on one sheet. First drawing is of transverse section at A.A, second drawing is of plan of superstructure and plan of foundations, third drawing is of back elevation, fourth drawing is of elevation, fifth drawing is of section at B.C.

12 June 1852

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at level of rails and plan of superstructure, fourth drawing is of sections at E, F, G and H, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Signed by J G Thomson.

27 June 1847

Four drawings on one sheet. First drawing is of elevation on square, second drawing is of plan of superstructure, third drawing is of section thro' A.B, fourth drawing is of back elevation.

12 June 1852

Two drawings on one sheet. First drawing is of plan of wall at line of rails, second drawing is of elevation. Signed by J Moore and J G Thomson.

04 August 1848

Three drawings on one sheet. First drawing is of cross section, second drawing is of plan of wall at line of rails, third drawing is of elevation.

[14 February 1847]

Six drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F, G and H, third drawing is of longitudinal section at A.B, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

27 June 1847

Eight drawings on one sheet. First drawing is of elevation, second drawings is of longitudinal section at C.D, third drawing is of elevation of inner girder, fourth drawing is of plan of foundations at line of rails and plan of superstructure, fifth drawing is of elevation of outer girder, sixth drawing is of transverse section at A.B, seventh drawing is of sections at E.F.G, eighth drawing is of end elevation.

27 June 1847

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at line of rails, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

29 December 1847

Three drawings on one sheet. First drawing is of longitudinal section at A.B and elevation, second drawing is of transverse section at C.D, third drawing is of plan.

[1847]

Powered by Preservica