search archive
browse archive Up

026B - Conway Tubular Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

One drawing on one sheet. Plan Showing Contours of Tide

19 November 1895

Two drawings on one sheet. New Columns for Supporting Girders General Elevation and Sections

1859-1922

Plan of Conwy Bridge, including the towers and boundary wall

4 August 1846

3 drawings on 1 sheet. Main drawing is section of Main Tower showing wing wall and the tube, along with rail level, high water etc. Also a plan of the turret and section of Angle Towers.

04 August 1846

Plan of proposed railway bridge alongside present suspension bridge and road showing river banks and footprint of Conway Castle.

04 August 1846

3 drawings on 1 sheet. Main drawing shows section of the bridge, showing high water level, rail level and sections at site of main towers. Also detail section of pedestals and front wall of main tower showing trenches filled with concrete.

04 August 1846

Powered by Preservica
Copyright © Network Rail