078 - Cornwall Railway - Liskeard Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Ten drawings on one sheet of transverse sections, elevations and plans including details of girders.

March 1855

Drawing is of an elevation of Lord Vivian's Bridge at 24 miles, 24 chains. The cost and style of masonry has been accepted and drawing is signed by Lord Vivian and initialled by Robert Pearson Brereton.

10 June 1854

Two drawings on one sheet. Bridge at 24 miles, 24 chains. First drawing is of a keystone, second drawing is of a section.

21 October 1854

Five drawings on one sheet. Bridge at 19 miles, 40 chains. First drawing is of north elevation, second drawing is of transverse section at CD, third drawing is of longitudinal section at AB, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of sections at E, F and G.

1845-1855

Three drawings on one sheet. Bridge at 19 miles, 74 chains. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of plan of superstructure and plan of foundation, third drawing is of sections at CD, fourth drawing is of longitudinal section, fifth drawing is of end view.

1845-1855

Two drawings on one sheet. Bridge at 24 miles, 24 chains. First drawing is of a keystone, second drawing is of a section.

[1854]

Five drawings on one sheet. Bridge at 21 miles, 34 chains. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of sections at C and D, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of transverse section.

26 November 1854

Four drawings on one sheet. First drawing is of an elevation, second drawing is of transverse section, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of longitudinal section.

23 November 1855

Six drawings on one sheet. First two drawings are of occupation bridge at 25 miles, 29 chains. First drawing is of an elevation, second drawing is of a plan. Third and fourth drawings are of public road bridge at 25 miles, 49 chains. Third drawing is of an elevation, fourth drawing is of a plan. Fifth and sixth drawings are of occupation bridge at 24 miles, 24 chains. Fifth drawing is of an elevation, sixth drawing is of a plan.

09 November 1854