search archive
browse archive Up

084/085 - Oxford Worcester and Wolverhampton Railway - Droitwich Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D, third drawing is of transverse section at E.F, fourth drawing is of plan of foundation on line at A.B and plan of superstructure, fifth drawing is of sections at G, H and I, sixth drawing is of side elevation. 20ft 8 1/2" span, 20 degree angle of skew.

[01 October 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D, third drawing is of plan of foundations taken at A.B on section and plan of superstructure, fourth drawing is of side elevation, fifth drawing is of sections at G, H and I, sixth drawing is of transverse section at E.F. 36 degree angle of skew.

[01 October 1846]

Four drawings on one sheet. First drawing is of elevation, second drawing is of end elevation, third drawing is of transverse section at C.D, fourth drawing is of longitudinal section at A.B.

[01 October 1846]

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of end elevation, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at C.D. 61ft span.

[01 October 1846]

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D, third drawing is of plan, fourth drawing is of plan of foundations at A.B and plan of superstructure, fifth drawing is of sections at G, H and I, sixth drawing is of transverse section at E.F, seventh drawing is of side elevation. Timber deck.

[01 October 1846]

Eight drawings on one sheet. First drawing is of transverse section at C.D and A.B, second drawing is of longitudinal section at E.F, third drawing is of elevation of piles, fourth drawing is of casting at G, fifth drawing is of casting at H, sixth drawing is of casting at I, seventh drawing is of casting at K, ninth drawing is of cap to piles.

[01 October 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at H.I on section and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

[01 October 1846]

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of end elevation, fourth drawing is of plan of superstructure and plan of foundation, fifth drawing is of side elevation. 50ft 3" span.

[01 October 1846]

Seven drawings on one sheet. First drawing is of plan of foundation at E.F and plan of superstructure, second drawing is of elevation, third drawing is of longitudinal section at A.B, fourth drawing is of transverse section at C.D, fifth drawing is of sections at G, H and I, sixth drawing is of side elevation, seventh drawing is of sections at K, L, M and N.

[01 October 1846]

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation.

[01 October 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at G.H and plan of superstructure, fourth drawing is of sections at E.F, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 8ft span.

[01 October 1846]

Six drawings on one sheet. First drawing is of sections at G, H and J, second drawing is of plan of foundations and plan of superstructure, third drawing is of section at K, fourth drawing is of cross section at C.D, fifth drawing is of back elevation, sixth drawing is of section through pier at L.M. 47 degree angle of skew.

[01 October 1846]

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of end elevation, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of end elevation. 50ft 3" span.

[01 October 1846]

Four drawings on one sheet showing working sketches of embankments and cuttings

1845-1850

Eight drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of longitudinal section, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of elevation, sixth drawing is of transverse section, seventh drawing is of longitudinal section, eighth drawing is of plan of superstructure and plan of foundations.

[01 October 1846]

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of end elevation, fourth drawing is of plan of superstructure and plan of foundations at E.F, fifth drawing is of transverse section at C.D. 53ft span.

[01 October 1846]

Twenty drawings on one sheet. Elevations, Sections and Plans of 2ft, 4ft, 5ft, 6ft and 10ft culverts.

[01 October 1846]

Twenty drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at A.B, third drawing is of longitudinal section at C.D, fourth drawing is of plan of foundation and plan of superstructure, fifth drawing is of elevation, sixth drawing is of transverse section at A.B, seventh drawing is of longitudinal section at C.D, eighth drawing is of plan of foundation and plan of superstructure, ninth drawing is of elevation, tenth drawing is of transverse section at A.B, eleventh drawing is of longitudinal section at C.D, twelfth drawing is of plan of foundation and plan of superstructure, thirteenth drawing is of elevation, fourteenth drawing is of transverse section at A.B, fifteenth drawing is of longitudinal section at C.D, sixteenth drawing is of plan of foundations and plan of superstructure, seventeenth drawing is of elevation, eighteenth drawing is of transverse section at A.B, nineteenth drawing is of longitudinal section at C.D, twentieth drawing is of plan of foundations and plan of superstructure.

[01 October 1846]

Powered by Preservica
Copyright © Network Rail