search archive
browse archive Up

042 - Great Western Railway Contract 3S

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of Thatchers Bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of half longitudinal section and half back elevation, third drawing is of transverse section, fourth drawing is of plan of superstructure and plan of foundations.

17 June 1839

Details of cutting and embankment. Two drawings on one sheet. Drawing No. 3 for Contract No. 3S. First drawing is of embankment for cross section No. 1 and second drawing is of cutting at cross section No. 2. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. William Smith Simpson bearing the date of seventeenth day of June 1839. Drawing is signed by Brunel and William Smith Simpson.

17 June 1839

Details of Mrs Mary Atkins Wright's bridge. Eight drawings on one sheet. First drawing is of elevation, second drawing is of half back elevation and half longitudinal section, third drawing is of transverse section at C.D, fourth drawing is of sections at H, G and F, fifth drawing is of enlarged plan of the iron shoe, sixth drawing is of half plan of superstructure and half plan of foundations, seventh drawing is of transverse section of iron shoe, eighth drawing is of half elevation of iron shoe and half longitudinal section of iron shoe.

17 June 1839

Powered by Preservica
Copyright © Network Rail