Details of Bridge. Six drawings on one sheet. Working drawing for Contract No. 2CR. First drawing is of an elevation, second drawing is of section thro' wing walls at EF, third drawing is of side elevation with longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at GH and IK, sixth drawing is of general plan with plan of foundations and plan of superstructure.

[1838-1845]

Details of Bridge. Three drawings on one sheet. Drawing of 8 Poole Road Bridge for Contract No. 2CR. First drawing is of an elevation and transverse section, [second drawing is of a side elevation and transverse section], third drawing is of a general plan.

[1838-1845]

Details of Bridge. Three drawings on one sheet. Drawing of occupation bridge for Contract No. 2CR. First drawing is of an elevation with a transverse section at CD, second drawing is of section at EF, third drawing is of side elevation.

[1838-1845]

Details of Bridge. Five drawings on one sheet. Drawing No. 6 for Contract No. 2Cra. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at EF. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]

Details of Bridge. Five drawings on one sheet. Drawing No. 8 for Contract No. 2 Cra. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at EF, fourth drawing is of general plan of foundations and plan of superstructure, fifth drawing is of transverse section at CD. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]

Details of Bridge. Five drawings on one sheet. Working drawing No. 6 for Contract No. 2CR. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan including plan of foundations and plan of super structure, fifth drawing is of transverse section at EF.

[1838-1845]

Details of Cutting and Embankment. Two drawings on one sheet. Drawing No. 3 for Contract No. 2 Cra. First drawing is of cutting cross section, second drawing is of embankment cross section. Drawing is signed by Isambard Kingdom Brunel and Thomas Oldham.

[1838-1845]

Parish Map. Drawing No. 2 for Contract No. 2 Cra. Drawing is elevation of landscape. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]

Details of Broad Gauge Track. Six drawings on one sheet for permanent way. First drawing is of transverse section at AB shewing the ballasting formed & completed, second drawing is of transverse section at CD shewing the ballasting when punned and before forming, third drawing is of strap bolts, fourth drawing is of transverse section at AB, fifth drawing is of elevation of longitudinal timbers with transverse section of plates and plan, sixth drawing is of general plan.

[1838-1845]

Details of tunnel portal. Two drawings on one sheet. Drawing No. 5A for Contract No. 2CR. First drawing is of south elevation, second drawing is of longitudinal section. Annotation on drawing reads the arch stones to be worked in the same manner as the Turnpike Road Bridge at Stratton St. Margaret's.

[1838-1845]

Details of Culverts. Eight drawings on one sheet. Drawing No. 9 for Contract No. 2Cra. First drawing is of elevation, second drawing is of transverse section, third drawing is of elevation, fourth drawing is of transverse section, fifth drawing is of plan, sixth drawing is of longitudinal section, seventh drawing is of plan, eighth drawing is of longitudinal section. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]

Details of Tunnel. Five drawings on one sheet. Drawing No. 5 for Contract No. 2CR. First drawing is of north elevation, second drawing is of back elevation of north front and transverse section at tunnel, third drawing is of a plan, fourth drawing is of sections at C, D, E and F, fifth drawing is of longitudinal section at AB. Annotation on drawing reads the arch stones to be worked in the same manner as the Turnpike Road Bridge at Stratton St. Margaret's.

[1838-1845]

Parish map. Drawing No. 1 for Contract No. 2 Cra. Drawing is of general plan. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]

Details of Bridge. Five drawings on one sheet. Drawing No. 7 for Contract No. 2 Cra. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section EF. Drawing is signed by Isambard Kingdom Brunel, Thomas Oldham and Elisha Oldham.

[1838-1845]