Object Type: Folder
In Folder: Historical Engineering Collection
Details of viaduct. Two drawings on one sheet. Drawing No. 15 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse sections at CD, EF, GH and IK.
12/31/34, 11:00 PM
Details of viaduct. Three drawings on one sheet. Drawing No. 8 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at EF.
12/31/34, 11:00 PM
Details of tunnel. Five drawings on one sheet. Drawing No. 12 for Contract No. 8L. First drawing is of a half elevation, second drawing is of section at AB, third drawing is of plan under cornice, fourth drawing is plan of section at CD, fifth drawing is of section at EF.
12/31/34, 11:00 PM
Details of cuttings. Two drawings on one sheet. Drawing No. 3 for Contract No. 8L. First drawing is of cutting No. 1 and second drawing is of cutting No. 2.
12/31/34, 11:00 PM
Details of bridge for road No. 68 Parish of Sonning. Five drawings on one sheet. Drawing No. 10 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. Drawing No. 1 for Contract No. 8L. First drawing is of an elevation and longitudinal section at AB, second drawing is of transverse section at EF, third drawing is of plan of foundations, sixth drawing is of plan of superstructure, fifth drawing is of transverse section at CD.
12/31/34, 11:00 PM
Details of bridge over alne in the Parish of Hurst. Four drawings on one sheet. Drawing No. 6 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is a general plan including plan for foundation and plan for superstructure, fourth drawing is of transverse sections at CD and EF.
12/31/34, 11:00 PM
Details of viaduct. Two drawings on one sheet. Drawing No. 14 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.
12/31/34, 11:00 PM
Details of viaduct. Two drawings on one sheet. Drawing No. 14 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.
12/31/34, 11:00 PM
Details of bridge over drain. Four drawings on one sheet. Drawing No. 9 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse section at EF, third drawing is a general plan including plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD.
12/31/34, 11:00 PM
Details of viaduct. Two drawings on one sheet. Drawing No. 18 for Contract No. 8L. First drawing is of an elevation, second drawing is of a plan of the river.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. Drawing No. 5 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of superstructure and plan under coping, fifth drawing is of transverse section at EF.
12/31/34, 11:00 PM
Details of accommodation bridge. Four drawings on one sheet. Drawing No. 13 for Contract No. 8L. First drawing is of elevation and longitudinal section at AB, second drawing is of section at EF, third drawing is of general plan including plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD.
12/31/34, 11:00 PM
Details of embankment. Drawing No. 4 for Contract No. 8L. Drawing is of embankment No. 1.
12/31/34, 11:00 PM
Details of tunnel. Four drawings on one sheet. Drawing No. 12A for Contract No. 8L. First drawing is of a transverse section thro' tunnel, second drawing is of transverse section thro' shaft, third drawing is of longitudinal section thro' tunnel front, fourth drawing is of longitudinal section thro' shaft.
12/31/34, 11:00 PM
Cross section of proposed line in Contract No. 8L with contract beginning Caversham Road and ending at Road to Rushcomb.
12/31/34, 11:00 PM
Details of viaduct. Two drawings on one sheet. Working Drawing No. 7 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.
12/31/34, 11:00 PM
Details of viaduct. Two drawings on one sheet. Drawing No. 15 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse sections at CD, EF, GH and IK.
12/31/34, 11:00 PM