search archive
browse archive Up

048 - Great Western Railway Contract 8L

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of accommodation bridge. Four drawings on one sheet. Drawing No. 13 for Contract No. 8L. First drawing is of elevation and longitudinal section at AB, second drawing is of section at EF, third drawing is of general plan including plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD.

1835-1845

Details of viaduct. Two drawings on one sheet. Drawing No. 14 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.

1835-1845

Details of Sonning Hill Bridge. One drawing on sheet showing cornice.

1835-1845

Details of embankment. Drawing No. 4 for Contract No. 8L. Drawing is of embankment No. 1.

1835-1845

Details of viaduct. Two drawings on one sheet. Drawing No. 15 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse sections at CD, EF, GH and IK.

1835-1845

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan with plan of superstructure and plan of under coping, fifth drawing is of transverse section at E.F.

1835-1845

Details of viaduct. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at E.F.

1835-1845

Details of bridge. Four drawings on one sheet. First drawing is of elevation and longitudinal section, second drawing is of transverse section at C.D, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section at E.F.

1835-1845

Drawing of the division of works on the widening of Sonning Cutting, for the contractors W.R. Parker and Co.

11 July 1890

Details of Sonning Hill Bridge. One drawing on sheet showing cornice.

1835-1845

Details of tunnel. Five drawings on one sheet. First drawing is of half elevation, second drawing is of section at A.B, third drawing is of plan under corpice, fourth drawing is of section at C.D, fifth drawing is of section at E.F.

1835-1845

Details of viaduct. Three drawings on one sheet. First drawing is of elevation, second drawing is of general plan of superstructure, third drawing is of plan of foundations.

1835-1845

Details of bridge. Three drawings on one sheet. First drawing is of elevation, second drawing is of general plan of superstructure, third drawing is of plan of foundations.

1835-1845

Details of bridge. Five drawings on one sheet. Drawing No. 1 for Contract No. 8L. First drawing is of an elevation and longitudinal section at AB, second drawing is of transverse section at EF, third drawing is of plan of foundations, sixth drawing is of plan of superstructure, fifth drawing is of transverse section at CD.

1835-1845

Details of cutting. Two drawings on one sheet. First drawing is of cutting No. 1, second drawing is of cutting No. 2.

1835-1845

Details of bridge over drain. Four drawings on one sheet. Drawing No. 9 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse section at EF, third drawing is a general plan including plan of foundations and plan of superstructure, fourth drawing is of transverse section at CD.

1835-1845

Details of viaduct. Two drawings on one sheet. Working Drawing No. 7 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.

1835-1845

Details of Sonning Hill Bridge. Four drawings on one sheet. First drawing is of section at A.B, second drawing is of elevation, third drawing is of elevation, fourth drawing is of section at C.D.

1835-1845

Powered by Preservica
Copyright © Network Rail