048 - Great Western Railway Contract 8L

Object Type: Folder
In Folder: Historical Engineering Drawings


View Gallery

Title
Description
Date

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan with plan of superstructure and plan of under coping, fifth drawing is of transverse section at E.F.

12/31/34, 11:00 PM

Details of viaduct. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at E.F.

12/31/34, 11:00 PM

Details of bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at E.F, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section is of C.D.

12/31/34, 11:00 PM

Details of Sonning Hill Bridge. One drawing on sheet showing cornice.

12/31/34, 11:00 PM

Details of tunnel. Four drawings on one sheet. First drawing is of transverse section thro' tunnel, second drawing is of transverse section thro' shaft, third drawing is of longitudinal section thro' tunnel front, fourth drawing is of longitudinal section thro' shaft.

12/31/34, 11:00 PM

Details of bridge over road No. 68 in the Parish Sonning. Five drawings on one sheet. First drawing is of elevation, second drawing Is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing Is of general plan of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

12/31/34, 11:00 PM

Details of cutting. Two drawings on one sheet. First drawing is of cutting No. 1, second drawing is of cutting No. 2.

12/31/34, 11:00 PM

Details of bridge. Three drawings on one sheet. First drawing is of elevation, second drawing is of general plan of superstructure, third drawing is of plan of foundations.

12/31/34, 11:00 PM

Details of Sonning Hill Bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at G.H, third drawing is of transverse section at E.F, fourth drawing is of transverse section at C.D.

12/31/34, 11:00 PM

Details of culverts. Twelve drawings on one sheet. Drawings one to three are of longitudinal sections, drawings four to six are of transverse sections, drawings seven to nine are of elevations, drawings ten to twelve are of plans.

12/31/34, 11:00 PM

Details of bridge over stream and road No. 13 in the Parish of Hurst. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of general plan of superstructure, fourth drawing is of plan of foundations, fifth drawing is of transverse section at C.D & E.F.

12/31/34, 11:00 PM

Details of bridge. Four drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section at E.F.

12/31/34, 11:00 PM

Details of bridge. Five drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at E.F, third drawing is of plan of superstructure, fourth drawing is of plan of foundations, fifth drawing is of transverse section at C.D.

12/31/34, 11:00 PM

Details of bridge over railway near Sonning Hill. Five drawings on one sheet. First drawing is of elevation and longitudinal section, second drawing is of transverse section at C.D, third drawing is of plan of foundations, fourth drawing is of plan of superstructure, fifth drawing is of transverse section at E.F.

12/31/34, 11:00 PM

Details of tunnel. Five drawings on one sheet. First drawing is of half elevation, second drawing is of section at A.B, third drawing is of plan under corpice, fourth drawing is of section at C.D, fifth drawing is of section at E.F.

12/31/34, 11:00 PM

Details of culvert. Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of transverse section at C.D.

12/31/34, 11:00 PM

Details of embankment. One drawing on sheet showing embankment no. 1.

12/31/34, 11:00 PM

Details of bridge. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of plan of superstructure, third drawing is of transverse section at E.F, right side of drawing only.

12/31/34, 11:00 PM

Powered by Preservica