048 - Great Western Railway Contract 8L

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of bridge over stream and road No. 13 in the Parish of Hurst. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of general plan of superstructure, fourth drawing is of plan of foundations, fifth drawing is of transverse section at C.D & E.F.

1835-1845

Details of viaduct. Two drawings on one sheet. Drawing No. 14 for Contract No. 8L. First drawing is of an elevation, second drawing is of a general plan including plan of foundations and plan of superstructure.

1835-1845

Details of Sonning Hill Bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at G.H, third drawing is of transverse section at E.F, fourth drawing is of transverse section at C.D.

1835-1845

Details of bridge. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of plan of superstructure, third drawing is of transverse section at E.F, right side of drawing only.

1835-1845

Details of accommodation bridge over road in meadow. Five drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at E.F, third drawing is of general plan of superstructure, fourth drawing is of plan of foundations, fifth drawing is of transverse section at C.D.

1835-1845

Details of viaduct. Two drawings on one sheet. Drawing No. 15 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse sections at CD, EF, GH and IK.

1835-1845

Cross section of proposed line in Contract No. 8L with contract beginning Caversham Road and ending at Road to Rushcomb.

1835-1845

Details of bridge. Four drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section at E.F.

1835-1845

Details of tunnel. Four drawings on one sheet. Drawing No. 12A for Contract No. 8L. First drawing is of a transverse section thro' tunnel, second drawing is of transverse section thro' shaft, third drawing is of longitudinal section thro' tunnel front, fourth drawing is of longitudinal section thro' shaft.

1835-1845

Details of bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at E.F, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section is of C.D.

1835-1845

Details of embankment. One drawing on sheet showing embankment no. 1.

1835-1845

Details of culverts. Twelve drawings on one sheet. Drawings one to three are of longitudinal sections, drawings four to six are of transverse sections, drawings seven to nine are of elevations, drawings ten to twelve are of plans.

1835-1845

Details of Sonning Hill Bridge. Two drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure.

1835-1845

Details of Sonning Hill Bridge. Five drawings on one sheet. First drawing is of section at A.B, second drawing is of elevation, third drawing is of end elevation, fourth drawing is of end elevation ,fifth drawing is of section at C.D.

1835-1845

Details of bridge. Five drawings on one sheet. Drawing No. 5 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of superstructure and plan under coping, fifth drawing is of transverse section at EF.

1835-1845

Details of bridge over alne in the Parish of Hurst. Four drawings on one sheet. Drawing No. 6 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is a general plan including plan for foundation and plan for superstructure, fourth drawing is of transverse sections at CD and EF.

1835-1845

Details of tunnel. Four drawings on one sheet. First drawing is of transverse section thro' tunnel, second drawing is of transverse section thro' shaft, third drawing is of longitudinal section thro' tunnel front, fourth drawing is of longitudinal section thro' shaft.

1835-1845

Details of cuttings. Two drawings on one sheet. Drawing No. 3 for Contract No. 8L. First drawing is of cutting No. 1 and second drawing is of cutting No. 2.

1835-1845