Details of tunnel. Five drawings on one sheet. Drawing No. 12 for Contract No. 8L. First drawing is of a half elevation, second drawing is of section at AB, third drawing is of plan under cornice, fourth drawing is plan of section at CD, fifth drawing is of section at EF.

1835-1845

Details of bridge over railway near Sonning Hill. Five drawings on one sheet. First drawing is of elevation and longitudinal section, second drawing is of transverse section at C.D, third drawing is of plan of foundations, fourth drawing is of plan of superstructure, fifth drawing is of transverse section at E.F.

1835-1845

Details of viaduct. Two drawings on one sheet. Drawing No. 18 for Contract No. 8L. First drawing is of an elevation, second drawing is of a plan of the river.

1835-1845

Details of viaduct. Three drawings on one sheet. Drawing No. 8 for Contract No. 8L. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at EF.

1835-1845

Details of bridge for road No. 68 Parish of Sonning. Five drawings on one sheet. Drawing No. 10 for Contract No. 8L. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

1835-1845

Details of bridge. Five drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at E.F, third drawing is of plan of superstructure, fourth drawing is of plan of foundations, fifth drawing is of transverse section at C.D.

1835-1845

Details of bridge over road No. 68 in the Parish Sonning. Five drawings on one sheet. First drawing is of elevation, second drawing Is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing Is of general plan of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

1835-1845

Details of culvert. Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of transverse section at C.D.