search archive
browse archive Up

096 - Wilts Somerset and Weymouth Railway - Bruton Deviation

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of back elevation. Signed by Isambard Kingdom Brunel and Matthew Craufurd.

15 March 1853

Six drawings on one sheet. First drawing is of elevation and longitudinal section, second drawing is of transverse section, third drawing is of elevation and longitudinal section, fourth drawing is of transverse section, fifth drawing is of plan of superstructure, sixth drawing is of plan of superstructure. Signed by Isambard Kingdom Brunel and Matthew Craufurd.

15 March 1853

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of end elevation, fifth drawing is of transverse section at C.D. Signed by Isambard Kingdom Brunel and Matthew Craufurd.

15 March 1853

Nine drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of transverse section, fourth section is of elevation, fifth drawing is of transverse section, sixth drawing is of plan, seventh drawing is of longitudinal section, eighth drawing is of plan, ninth drawing is of longitudinal section. Signed by Isambard Kingdom Brunel and Matthew Craufurd. 8ft and 12ft culverts.

15 March 1853

Powered by Preservica
Copyright © Network Rail