Object Type: Folder
In Folder: Historical Engineering Drawings
Details of retaining wall at Wormwood Scrubs. Two drawings on one sheet. First drawing is of [elevation] of retaining wall at Wormwood Scrubs, second drawing is of [elevation] of retaining wall at Wormwood Scrubs.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of culvert. One drawing on sheet showing [plan of foundations and plan of superstructure].
12/31/34, 11:00 PM
Details of archway at Hanwell. Five drawings on one sheet. Drawing No. 8 for contract No. 9L. First drawing of elevation, second drawing of plan of foundation and plan of superstructure, third drawing of longitudinal section at AB, fourth drawing of transverse section at EF and fifth drawing of transverse section at CD.
12/31/34, 11:00 PM
Details of cutting and embankment. Two drawings on one sheet. First drawing is of cutting No. 1, second drawing is of embankment No. 1.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of superstructure and plan of foundation, fifth drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of cutting and embankment. Two drawings on one sheet. Drawing No. 3 for contract No. 9L. First drawing of cutting, second drawing of embankment. The drawing is signed by Hugh McIntosh.
12/31/34, 11:00 PM
Details of tunnel. Five drawings on one sheet. First drawing is of transverse section at A.B, second drawing is of transverse section at C.D, third drawing is of plan at E.F, fourth drawing is of longitudinal section at G.H, fifth drawing is of longitudinal section.
12/31/34, 11:00 PM
Plan of line. Drawing No. 1 for Contract No. 9L of proposed line between Hanwell Parish and parish of Ealing. The drawing is signed by Hugh McIntosh.
12/31/34, 11:00 PM
Details of bridge. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of Bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F. Note reads 'Altered to a skew bridge, see working drawing No4'.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. Drawing No. 5 for contract No. 9L. First drawing of elevation, second drawing of longitudinal section at AB, third drawing of transverse section at CD, fourth drawing of a general plan including plan of superstructure and plan of foundations, fifth drawing of transverse section at EF. The drawing is signed by Hugh McIntosh.
12/31/34, 11:00 PM
Details of culvert. Two drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D.
12/31/34, 11:00 PM
Details of bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B and elevation, second drawing is of transverse section at C.D, third drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of foundation and plan of superstructure, fifth drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing Is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at E.F.
12/31/34, 11:00 PM
Details of bridge. Five drawings on one sheet. Drawing No. 4 for contract No. 9L. First drawing of elevation, second drawing of longitudinal section at AB, third drawing of transverse section at CD, fourth drawing of a general plan including plan of superstructure and plan of foundations, fifth drawing of transverse section at EF. This drawing is signed by Hugh McIntosh.
12/31/34, 11:00 PM