049 - Great Western Railway Contract 9L

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of bridge. Five drawings on one sheet. Drawing No. 6 for contract No. 9L. First drawing of elevation, second drawing of longitudinal section at AB, third drawing of transverse section at CD, fourth drawing of a general plan including plan of superstructure and plan of foundations, fifth drawing of transverse section at EF. The drawing is signed by Hugh McIntosh.

1835-1840

Details of retaining wall at Wormwood Scrubs. Two drawings on one sheet. First drawing is of [elevation] of retaining wall at Wormwood Scrubs, second drawing is of [elevation] of retaining wall at Wormwood Scrubs.

1835-1840

Details of culvert. Two drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B.

1835-1840

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of superstructure and plan of foundation, fifth drawing is of transverse section at E.F.

1835-1840

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

1835-1840

Details of culvert. Two drawings on one sheet. First drawing is of transverse section at E.F, second drawing is of elevation at G.H.

1835-1840

Cross section of proposed line in contract No. 9L with contract beginning from River Brent ending at Road. The drawing is signed by Hugh McIntosh.

1835-1840

Details of culvert. One drawing on sheet showing [plan of foundations and plan of superstructure].

1835-1840

Details of bridge. Five drawings on one sheet. First drawing is of elevation and longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of plan of foundation, fourth drawing a plan of superstructure, fifth drawing is of transverse section at E.F.

1835-1840

Details of bridge. Five drawings on one sheet. Drawing No. 4 for contract No. 9L. First drawing of elevation, second drawing of longitudinal section at AB, third drawing of transverse section at CD, fourth drawing of a general plan including plan of superstructure and plan of foundations, fifth drawing of transverse section at EF. This drawing is signed by Hugh McIntosh.

1835-1840

Details of bridge. Five drawings on one sheet. Drawing No. 5 for contract No. 9L. First drawing of elevation, second drawing of longitudinal section at AB, third drawing of transverse section at CD, fourth drawing of a general plan including plan of superstructure and plan of foundations, fifth drawing of transverse section at EF. The drawing is signed by Hugh McIntosh.

1835-1840

Details of bridge. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at E.F.

1835-1840

Details of culverts. Eleven drawings on one sheet. Drawings one to three are of longitudinal sections, drawings four to six are of transverse sections, drawings seven to nine are of elevations, drawings ten and eleven are of plans.

1835-1840

Details of cutting and embankment. Two drawings on one sheet. First drawing is of cutting No. 1, second drawing is of embankment No. 1.

1835-1840

Details of culvert. Two drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D.

1835-1840

Details of bridge. Four drawings on one sheet. First drawing is of longitudinal section at A.B and elevation, second drawing is of transverse section at C.D, third drawing is of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

1835-1840

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing Is of transverse section at C.D, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at E.F.

1835-1840