search archive
browse archive Up

049 - Great Western Railway Contract 9L

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of cutting and embankment. Two drawings on one sheet. Drawing No. 3 for contract No. 9L. First drawing of cutting, second drawing of embankment. The drawing is signed by Hugh McIntosh.

1835-1840

Plan of line. Drawing No. 1 for Contract No. 9L of proposed line between Hanwell Parish and parish of Ealing. The drawing is signed by Hugh McIntosh.

1835-1840

Details of bridge No. 37 in the Parish of Ealing. Five drawings on one sheet. First drawing is of elevation, second drawing Is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing Is of general plan of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

1835-1840

Details of tunnel. Five drawings on one sheet. First drawing is of transverse section at A.B, second drawing is of transverse section at C.D, third drawing is of plan at E.F, fourth drawing is of longitudinal section at G.H, fifth drawing is of longitudinal section.

1835-1840

Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of plan of foundation and plan of superstructure, fifth drawing is of transverse section at E.F.

1835-1840

Details of Bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan of plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F. Note reads 'Altered to a skew bridge, see working drawing No4'.

1835-1840

Details of archway at Hanwell. Five drawings on one sheet. Drawing No. 8 for contract No. 9L. First drawing of elevation, second drawing of plan of foundation and plan of superstructure, third drawing of longitudinal section at AB, fourth drawing of transverse section at EF and fifth drawing of transverse section at CD.

1835-1840

Details of culverts. Twelve drawings on one sheet. Drawing No. 7 for contract No. 9L. First drawing of longitudinal section, second drawing of longitudinal section, and third drawing of longitudinal section. Fourth drawing of transverse section, fifth drawing of transverse section and sixth drawing of transverse section. Seventh drawing of elevation, eight drawing of elevation and ninth drawing of elevation. Tenth drawing of plan, eleventh drawing of plan and twelfth drawing of plan. This drawing is signed by Hugh McIntosh.

1835-1840

Powered by Preservica
Copyright © Network Rail