search archive
browse archive Up

055/056/057/058/059/060 - Great Western Railway Paddington Station [New Station]

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Paddington Station Alterations. Twelve drawings on one sheet including plan of platform, elevations, cross sections and details of steelwork to platform No. 9 for 70'.0" Traerser. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station: Carriage Department, stores and clerks offices. Drawing is of plan of ground floor.

1845-1855

Paddington New Station Roof. Eight drawings on one sheet of sections, details and wrought iron girders under ribs.

1845-1855

Paddington Station. Drawing is for roofing contract and is of general plan of roofing shewing the extent of contract bounded by the Red Line.

1845-1855

Paddington Station Additional Offices. Six drawings on one sheet. First drawing is of cast iron column and key plan, second drawing is of elevation, third drawing is of sectional plan of base and columns, fourth drawing is of plan section AB, fifth drawing is of plan on top, sixth drawing for section AB. Drawing is signed by Lancaster Owen.

25 May 1878

GWR Paddington Station. Plan showing showing details of the foundations, drainage etc under the passenger station as well as the track layout.

23 August 1916

Paddington Station new season ticket office. Thirteen drawings on one sheet. Drawings are of elevations of deal screen, floor plans, various sections and an elevation of oak screen. Drawing is signed by WW Grierson, Sleabold and Hunt and Son.

17 December 1904

Paddington Station Alterations. Six drawings on one sheet showing outside elevation, plan on top, details at A and details of downpipe. Illustrated wording on end screen states Great Western Railway Arrival Platforms

04 June 1914

Paddington Station Alerations. Four drawings on one sheet for details of new main roof. First drawing is of front elevation at Praed Street End, second drawing is of part elevation looking from road, third drawing is of sectional elevation and station side, fourth drawing is of outside elevation road side. Drawing is signed by Ralph Holliday for Holliday and Greenwood. Drawing also contains list of drawings and reference drawings.

28 April 1914

Paddington Station New Office Block. 1/40" Scale Site Plan. Drawing showing site plan of Paddington station; platforms 1-10, the Lawn, the GWR Royal Hotel, cab road and GPO sorting office with additional detail around the new offices.

29 December 1931

Paddington New Station Roof. Three drawings on one sheet. Drawings are of the details of connection of hip ribs and connection of segments with hip ribs. First drawing is of sectional view thro' a,a, second drawing is of sectional elevation thro' a, a, third drawing is of sectional plan thro' b, b.

1845-1855

Paddington New Station: Details Generally for Gallery & Paxton Roofing shewing General Charecterists of Foundations for Columns. Four drawings on one sheet. Drawing is for roofing contract and drawing is of elevation of roof and various details.

1845-1855

Paddington Station Alterations. Sixteen drawings of details of purlins at ridge. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington New Station Roof. Five drawings on one sheet. Drawings are of details of transept skylight. First drawing is of sectional elevation thro' boarding of lead flat at a, a, and elevation of standards from b, b, second drawing is of section of valley gutter, hip rib gutter, and ridge thro' c, c, third drawing is of drawing at C, fourth drawing is of drawing at D, fifth drawing is of elevation of standard.

1845-1855

Paddington Station Alterations. Sixteen drawings on one sheet of various details and elevations for details of new main roof. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington Station Alterations. Nine drawings on one sheet of various details, sections and elevations for details of roof. Drawing is signed by Ralph Holliday for Holliday and Greenwood.

28 April 1914

Paddington New Station Roof. Details of Roof trusses. Several drawings on one sheet showing details of the 120 ft truss. Drawings include section thro' AB, part section at EF, girder elevation, and section at GH.

1845-1855

Paddington Station: Carriage, Sheds, Workshops etc. Seven drawings on one sheet. Drawings for carriage, sheds, workshops etc. Drawings show elevations, plans and details of sliding gates etc at west end.

27 September 1855

Powered by Preservica
Copyright © Network Rail