Object Type: Folder
In Folder: Historical Engineering Drawings
Paddington Station Additional Offices. Eight drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoe for girders and plans. Drawing is signed by Lancaster [Owen].
6/4/78, 11:00 PM
Paddington Station. Drawing is a sketch relating to foundations, drainage etc.
12/31/44, 11:00 PM
Paddington Station. Six drawings on one sheet. First drawing is of transverse section at AB, second drawing is of plan, third drawing is of transverse section at EF, fourth drawing is of transverse section at LM, fifth drawing is of transverse section at GH, sixth drawing is of longitudinal section at IK.
12/31/44, 11:00 PM
Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoes and plan. Drawing is signed by Lancaster Owen.
5/26/78, 11:00 PM
Paddington Station Additional Offices. Six drawings on one sheet. First drawing is of cast iron column and key plan, second drawing is of elevation, third drawing is of sectional plan of base and columns, fourth drawing is of plan section AB, fifth drawing is of plan on top, sixth drawing for section AB. Drawing is signed by Lancaster [Owen].
5/26/78, 11:00 PM
Paddington Station Proposed Alterations. Drawing is of proposed alterations for the position of lines at Paddington Station as well as a proposed new departure platform. Drawing also contains details of an approximate estimate for new platforms, lines, crossings, switches, signals and general alterations.
3/28/84, 11:00 PM
Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoes and plan. Drawing is signed by Lancaster O[wen].
6/4/78, 11:00 PM
Paddington Station. Five drawings on one sheet. First drawing is of a plan showing subway, second drawing is of section thro' subway under rails, third drawing is of cross section thro' stairs, fourth drawing is of longitudinal section of stairs, fifth drawing is of detail of rail bearer.
2/10/89, 11:00 PM
Paddington Station Additional Offices. Six drawings on one sheet. First drawing is of cast iron column and key plan, second drawing is of elevation, third drawing is of sectional plan of base and columns, fourth drawing is of plan section AB, fifth drawing is of plan on top, sixth drawing for section AB. Drawing is signed by Lancaster Owen.
5/24/78, 11:00 PM
Paddington Station Additional Offices. Eleven drawings on one sheet. Drawings include elevations and plans of girders, plates, section of floor and arrangements of bolts. Drawing is signed by Lancaster Owen.
6/4/78, 11:00 PM
Paddington Station. Two drawings on one sheet. First drawing is of second floor plan for offices, second drawing is of first floor plan for offices.
12/31/54, 11:00 PM
Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and sectional plans of girders, plates, floor and details of brackets. Drawing is signed by Lancaster Owen.
5/26/78, 11:00 PM
GWR Paddington Station. Plan showing showing details of the foundations, drainage etc under the passenger station as well as the track layout.
8/22/16, 11:00 PM
Paddington Station Additional Offices. Ten drawings on one sheet. Drawings include elevations and plans of girders, cast iron shoes and plan. Drawing is signed by Lancaster O[wen].
6/4/78, 11:00 PM
Paddington Station. New extension of office over Royal Waiting Room. Three drawings on one sheet. First drawing is of section on line AB, second drawing is of section on line CD, third drawing is of plan of 1st floor.
12/31/05, 11:00 PM
Paddington Station. Three drawings on one sheet [all of screen details for new seaon ticket office].Drawing is signed by WW Grierson.
10/21/04, 11:00 PM
Paddington Station. Eight drawings on one sheet. Drawings are of elevation from booking hall and various sections including plan of stanchion head. Drawing is signed by WW Grierson, Sleabold and Hunt and Son.
9/14/04, 11:00 PM
Paddington Station. Three drawings on one sheet. First drawing is of an elevation, second drawing is of a plan, third drawing is of detail of ring handle. Drawing is signed by Grierson, and contractors A Jackman and Son on 23rd April 1906 and a witness.
2/18/06, 11:00 PM