Paddington New Station. Drawing is for roofing contract and is of transverse section thro' principal roof and Paxton roofing adjoining arrival platform.

12/31/44, 11:00 PM

Drawings of the gangway leading from the platform to the hotel, including elevation, section, cross section, details of rails, and plan of fixing bolt holes

Alterations to second arrival platform. Contract for approaches etc., drawing for three bridges in platform, including section and elevation

Drawings for timber framing for diagonal lines, including sectional elevations, elevation, and plan

Drawings of gallery from the station to the hotel, including front and back elevations.

Drawings for cast iron girders to support the gangway between the platform and hotel, including elevations, sectios and cross sections of girders, and plan showing the position of the girders

Two drawings of lift apparatus, no annotations/measurements/notes

Drawings for casting for a guide for the station lift

Drawings of timber framing for the permanent way to the arrival line, plan and cross section

Drawings showing retaining walls and approach walls between Ranelagh Bridge and Black Lion Road Bridge Paddington

Drawings of the rods to tie the new span of roof at Paddington station, including plan, part-plan, elevation, sectional plan and details

Drawing of skylights within the railings in the passage under the rails between the arrival and departure platforms; calculations on the reverse

Paddington Station: Carriage Department, stores and clerks offices. Five drawings on one sheet. First drawing is of elevation next bridge, second drawing is of west elevation, third drawing is of south elevation, fourth drawing is of section on line AB, fifth drawing is of north elevation.

12/31/44, 11:00 PM

Paddington Station: Carriage Department, stores and clerks offices. Two drawings on one sheet. First drawing is of plan of first floor, second drawing is of plan of roofs.

12/31/44, 11:00 PM

Paddington Station: Carriage, Sheds, Workshops etc. Seven drawings on one sheet. Drawings for carriage, sheds, workshops etc. Drawings show elevations, plans and details of sliding gates etc at west end.

9/26/55, 11:00 PM

Drawing is of plan the new Paddington Station with arrangements connected with the water showing hydrants and pipes.

12/31/44, 11:00 PM

Paddington Station: Carriage, Sheds, Workshops etc. Drawing for carriage, sheds, workshops etc. of stairs up to store room. Drawing is elevation of cast iron string.

1/13/56, 11:00 PM

Two drawings on one sheet. Drawing for carriage, sheds, workshops etc. Drawing is of cast iron column and wrought iron girder.

10/30/55, 11:00 PM