Object Type: Folder
In Folder: Historical Engineering Drawings
Five drawings on one sheet of [hydraulic machinery for turntable at Paddington Station]. Drawing done by W Armstrong.
12/31/44, 11:00 PM
Paddington New Station Roof. Several drawings on one sheet. two which are labelled. Drawings are of details of skylight. First labelled drawing is of sectional elevations, second labelled drawing is of sections of gutter, sky light bars and then half the annotation is missing.
12/31/44, 11:00 PM
Paddington Station. Six drawings on one sheet of details of coping, brackets and sections.
12/31/44, 11:00 PM
Paddington New Station. Nine drawings on one sheet of various girders and sections.
12/31/44, 11:00 PM
WR Co Hotel Hoist Paddington. Drawing is of hotel hoist for Paddington including guides and shows plan, end and side view.
12/31/44, 11:00 PM
Paddington New Station. Three drawings on one sheet and drawing is of contract for roofing. First drawing is of ordinary ribs for centre and east spans of principle roof over railway, second drawing is of section at AB, third drawing is of section at CD.
12/31/44, 11:00 PM
Drawing is of a transverse section of Paddington Station.
12/31/44, 11:00 PM
Paddington New Station Roof. Two unlabelled drawings on one sheet. Drawings are of mode of fixing ordinary ribs over columns.
12/31/44, 11:00 PM
Paddington New Station. Eleven drawing is one sheet of wrought iron girders under ribs. Drawing for roofing contract.
12/31/44, 11:00 PM
Sketch relating to a proposed hotel hoist at Paddington Hotel.
12/31/44, 11:00 PM
Sketch relating traversing machinery at Paddington Station.
1/31/51, 11:00 PM
GWR Co Paddington Hotel Hoist Cage. Three drawings on one sheet of Paddington Hotel Hoist Cage showing sections and elevation.
5/9/54, 11:00 PM
Paddington Station. Drawing is for roofing contract and is of general plan of roofing shewing the extent of contract bounded by the Red Line.
12/31/44, 11:00 PM
Two drawings on one sheet of hydraulic machinery for turntable at Paddington Station showing both plan and elevation. Drawing done by W Armstrong.
12/31/44, 11:00 PM
Paddington New Station. Ten drawings on one sheet. Drawings include plans and elevations of sections for ordinary trussed gutter.
12/31/44, 11:00 PM
Paddington Station. Three drawings on one sheet showing plans, elevations and sections of girders for Paxton roofing over railway and gallery leading to hotel.
12/31/44, 11:00 PM
Paddington Station. Four drawings on one sheet. First drawing is of transverse station shewing elevation of wrought iron trussed girders, HH, second drawing is of elevation of wrought iron trussed girder A, third drawing is of longitudinal section and elevation of wrought iron trussed girders BB and C, fourth drawing is of long section shewing elevation of wrought iron trussed girders DD and E.
12/31/44, 11:00 PM
Paddington New Station. Five drawings on one sheet. Drawings are of details of 70 ft. truss. First drawing is of timber before truss, second drawing is of plan of bottom and plan of top of truss, third drawing is of a section of the truss, fourth drawing is of a different section of the truss and fifth drawing is of another section of the truss.
12/31/44, 11:00 PM