search archive
browse archive Up

028 - Maidenhead Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Maidenhead Bridge. Working drawing No. 1 for Contract No. 6L. Drawing is of an elevation of a section of the bridge showing measurements relating to one of the main arches.

May 1836

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Five drawings on one sheet. First drawing is cross section AB, second drawing is of half cross section CD, third drawing is of section at GH, fourth drawing is of coupling, fifth drawing is of half cross section EF. Signed by Edward Olander.

29 July 1890

Maidenhead Bridge. Four drawings on one sheet. Drawing No. 2 for Contract No. 6L. First drawing is of a longitudinal section, second drawing is of transverse section at A, third drawing is of transverse section at B, fourth drawing is of transverse section at C.

May 1836

Maidenhead Bridge Data Drawing. Drawing is an elevation of west span on Maidenhead Bridge loaded with dead load showing different stresses.

13 June 1913

Maidenhead Bridge Data Drawing. Drawing shows diagram of stresses for various different forces and loads.

13 June 1913

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Four drawings on one sheet. First drawing is of section thro' centre pier, second drawing is of section thro' centre of arch, third drawing is of half sectional plan at springing, fourth drawing is of sectional plan at abutment. Signed by Edward Olander.

07 July 1890

Maidenhead Bridge Data Drawing. Drawing is of half section plan at springing and section through centre pier.

[1913]

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Five drawings on one sheet. First drawing is cross section AB, second drawing is of half cross section CD, third drawing is of section at GH, fourth drawing is of coupling, fifth drawing is of half cross section EF. Signed by Edward Olander.

07 July 1890

Widening of line Maidenhead to Didcot, Maidenhead Bridge, showing centring for arches. Eight drawings on one sheet. First drawing is a elevation second drawing is section at A A, third drawing is of cross section, fourth drawing is of detail at B, fifth drawing is of detail at C, sixth drawing is of detail at E, seventh drawing is of detail at F, seventh drawing is of detail at G. Signed by Edward Olander.

06 August 1890

Maidenhead Bridge Data Drawing. Drawings are of stresses on arch on Maidenhead Bridge for loading and the ballast.

13 June 1913

Maidenhead Bridge. Drawing is of elevation of arches on north side.

1890

Maidenhead Bridge Data Drawing. Drawing is of cross section at GH.

[1929]

Maidenhead Bridge. Drawing is of section at crown showing level of rails and existing arch.

1890

Maidenhead Bridge Data Drawing. Drawings are of stresses on arch on Maidenhead Bridge. Live and dead loads with GWR locomotive Great Bear.

13 June 1913

Four drawings on one sheet shwoing details of the parapet. Working Drawing No. 2 for Contract No. 6L. First drawing is of section at AB, second drawing is of an elevation, third drawing is of section at CD, fourth drawing is of a plan.

May 1836

Maidenhead Bridge Data Drawing. Two drawings on one sheet. First drawing is of proposed additional tie rods half section AB and half section CD, second drawing is of a plan.

06 September 1921

Drawing No.I for Contract No. 6L. Drawing is of an aerial view of the plan for the location of the Maidenhead Bridge.

May 1836

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Four drawings on one sheet. First drawing is of section thro' centre pier, second drawing is of section thro centre of arch, third drawing is of half sectional plan at springing, fourth drawing is of sectional plan at abutment. Signed by Edward Olander.

29 July 1890

Powered by Preservica
Copyright © Network Rail