search archive
browse archive Up

028 - Maidenhead Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Maidenhead Bridge Data Drawing. Five drawings on one sheet. First drawing is of longitudinal section on central line of bridge, second drawing is of springing at east end, third drawing is of springing at west end, fourth drawing is of view of west wall of chamber, fifth drawing is of cross section BC.

[1929]

Maidenhead Bridge. Two drawings on one sheet. Drawing No. 3 for Contract No. 6L. First drawing is of an elevation, second drawing is of a plan.

May 1836

Maidenhead Bridge Data Drawing. Six drawings on one sheet of corroded barlows under tracks up main line. Drawings are of plans of bearings and full size.

26 April 1929

Drawing is of an outline of the line of one of the arches for Maidenhead Bridge with pencil calculations.

May 1836

Maidenhead Bridge Data Drawing. Drawing is an elevation of an arch on the Maidenhead Bridge as a diagram showing different stresses as well as dead and live loads.

[13June 1913]

Maidenhead Bridge Data Drawing. Drawing shows curves of equilibrium relating to stressing of arches.

[1913]

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Two drawings on one sheet. First drawing is of half longitudinal section, second drawing is of horizontal section thro spandrill walls part sectional plan at springing. Signed by Edward Olander.

07 July 1890

Widening of line Maidenhead to Didcot, Maidenhead Bridge, including centrings for arches. Eight drawings on one sheet. First drawing is a elevation second drawing is section at A A, third drawing is of cross section, fourth drawing is of detail at B, fifth drawing is of detail at C, sixth drawing is of detail at E, seventh drawing is of detail at F, eighth drawing is of detail at G. Signed by Edward Olander.

15 August 1891

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Two drawings on one sheet. First drawing is of elevation of bridge, second drawing is of plan of the track. Signed by [Edward Olander].

07 July 1890

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Two drawings on one sheet. First drawing is of half longitudinal section, second drawing is of horizontal section thro' spandril walls, part sectional plan at springing. Signed by Edward Olander.

27 July 1890

Widening of line Maidenhead to Didcot, Maidenhead Bridge. Two drawings on one sheet. First drawing is of elevation of bridge, second drawing is of plan of the track. Signed by [Edward Olander].

25 July 1890

Powered by Preservica
Copyright © Network Rail