Object Type: Folder
In Folder: Historical Engineering Collection
Five drawings on one sheet. Drawing No. 4 for Contract No. 2E. First drawing is of an elevation, second drawing is of longitudinal section, third drawing is of end view, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of transverse section. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Drawing No. 2 for Contract No. 2E. Drawing is of a cross section of the land for the Contract No. 2E. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Drawing No. 1 for Contract No. 2E. Drawing shows plan of the route of the line between Halberton, Willand and Cullompton. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Eight drawings on one sheet. Drawing No. 6 for Contract No. 2E. First drawing is of an elevation, second drawing is of a section, third drawing is of an elevation, fourth drawing is of a section, fifth drawing is of a plan, sixth drawing is of longitudinal section, seventh drawing is of a plan, eighth drawing is of longitudinal section. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Five drawings on one sheet. Drawing No. 5 for Contract No. 2E. First drawing is of an elevation, second drawing is of longitudinal section, third drawing is of end view, fourth drawing is of plan of superstructure with plan of foundations, fifth drawing is of transverse section. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Six drawings on one sheet. Drawing No. 8 for Contract No. 2E. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of section at AB, fourth drawing is of sections at EF, GH and IK, fifth drawing is of section at CD, sixth drawing is of end view. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Two drawings on one sheet. Drawing No. 3 for Contract No. 2E. First drawing is of a cutting, second drawing is of an embankment. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM
Five drawings on one sheet. Drawing No. 7 for Contract No. 2E. First drawing is of an elevation, second drawing is of section at AB, third drawing is of end view, fourth drawing is of plan of superstructure with plan of foundations, fifth drawings is of section on line CD looking from B to A. Drawing is signed by Samuel Bromhead and I K Brunel.
12/31/34, 11:00 PM