086/087/088 - Oxford Worcester and Wolverhampton Railway - Evesham Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundation at road line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Signed by John G Thomson.

26 July 1847

Nine drawings on one sheet. First three drawings are sections through 2ft culvert. Fourth to ninth drawings are cross sections through embankments. Signed J G Thomson. 'sanctioned by Mr Brunel'

28 May 1847

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation. Signed by Isambard Kingdom Brunel.

1848

Three drawings on one sheet. First drawing is of sections at E, F and G, second drawing is of plan of foundations at line of rails and plan of superstructure, third drawing is of sections at H, I, K and L. Signed by Isambard Kingdom Brunel and J G Thomson.

09 December 1847

Three drawings on one sheet. First drawing is of elevation, second drawing is of side elevation, third drawing is of transverse section at A.B and transverse section at C.D. Signed by J G Thomson.

10 July 1847

Three drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D, third drawing is of transverse section at C.D and transverse section at A.B.

1845-1855

Three drawings on one sheet. First drawing is of elevation, second drawing is of side elevation, third drawing is of transverse section.

1845-1850

Six drawings on one sheet. First drawing is of plan of foundations at O.P, second drawing is of abutments, north and south, third drawing is of side elevation, fourth drawing is of abutments, north and south, fifth drawing is of plan of superstructure, sixth drawing is of sections at E, F, G, H, I, J and K.

28 March 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation. Pencil annotation, 'signed by Isambard Kingdom Brunel.'

09 February 1848

Four drawings on one sheet. First drawing is of plan of foundations, second drawing is of section through abutment at K.L on plan., third drawing is of plan of superstructure, fourth drawing is of sections at E, F, G, H, I and J.

1845-1855

Three drawings on one sheet. First drawing is of plan of foundations at ground line, second drawing is of side elevation, third drawing is of sections at A and B.

1845-1855

Four drawings on one sheet. First drawing is of plan of foundations at plinth level, second drawing is of section of abutment at K.L on plan, third drawing is of plan of superstructure, fourth drawing is of sections at E, F, G, H, I and J.

1845-1855

One drawing on sheet showing plan of superstructure and plan of foundations at level of plinth.

1845-1855

Eleven drawings on one sheet. First drawing is of casting at E, second drawing is of casting at G, third drawing is of plan at M, fourth drawing is of casting at N, fifth drawing is of plan, sixth drawing is of plan, seventh drawing is of casting at F, eighth drawing is of casting at L, ninth drawing is of casting at K, tenth drawing is of casting at I, eleventh drawing is of casting at M.

1845-1855

Various drawings on sheet showing plans and elevations of joints, bolts and fixtures.

1845-1855

Various drawings on sheet showing plans and elevations.

1845-1855

Six drawings on one sheet. First drawing is of side elevation, second drawing is of castings at section B, third drawing is of castings at section C, fourth drawing is of sections at E, F, G, H and I, fifth drawing is of castings at section A, sixth drawing is of castings at section D.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

1845-1855