search archive
browse archive Up

086/087/088 - Oxford Worcester and Wolverhampton Railway - Evesham Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at E, F and G, third drawing is of plan of foundations at line H.I and plan of superstructure, fourth drawing is of side elevation, fifth drawing is of transverse section at C.D, sixth drawing is of part of contract section, seventh drawing is of elevation. Signed by Isambard Kingdom Brunel and J G Thomson.

04 August 1847

Eleven drawings on one sheet. First drawing is of casting at E, second drawing is of casting at G, third drawing is of plan at M, fourth drawing is of casting at N, fifth drawing is of plan, sixth drawing is of plan, seventh drawing is of casting at F, eighth drawing is of casting at L, ninth drawing is of casting at K, tenth drawing is of casting at I, eleventh drawing is of casting at M.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 30ft span.

1845-1855

Twenty four drawings on one sheet. Drawings one to six are of elevations, drawings seven to twelve are of transverse sections, drawings thirteen to eighteen are of longitudinal sections, drawings nineteen to twenty four are of plans of foundations and plans of superstructure. 2ft 7", 3ft, 3", 3ft 11", 4ft 8", 5ft 4" and 6ft culverts.

1845-1855

Five drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of longitudinal section and elevation, third drawing is of end elevation, fourth drawing is of detail of parapet, fifth drawing is of under planking and plan of superstructure. Open parapet.

1848

Six drawings on one sheet. First drawing is of part of contract plan, second drawing is of part of contract section, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of side elevation and longitudinal section at A.B, fifth drawing is of transverse section at C.D, sixth drawing is of elevation. Signed by J G Thomson and J Moore.

14 June 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation.

14 February 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundation at line E.F and plan of superstructure, fourth drawing is of sections at G, H and J, fifth drawing is of plan, sixth drawing is of transverse section at C.D, seventh drawing is of back elevation. Signed by J G Thomson and J H Gallott.

24 July 1847

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 35ft 4 1/2inch span.

1845-1855

Seven drawings on one sheet. First drawing is of elevation, second drawing is of cross section, third drawing is of part of contract drawing no. 1, fourth drawing is of plan of elevation of S E wing wall of contract drawing no. 15, fifth drawing is of plan, sixth drawing is of elevation, seventh drawing is of part of cross section. Signed by J G Thomson.

04 November 1847

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

1845-1855

Four drawings on one sheet. First drawing is of plan of foundations, second drawing is of section through abutment at K.L on plan., third drawing is of plan of superstructure, fourth drawing is of sections at E, F, G, H, I and J.

1845-1855

Three drawings on one sheet. First drawing is of sections at E, F and G, second drawing is of plan of foundations at line of rails and plan of superstructure, third drawing is of sections at H, I, K and L. Signed by Isambard Kingdom Brunel and J G Thomson.

09 December 1847

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of [plan], fourth drawing is of plan of foundations at road line and plan of superstructure, fifth drawing is of section at E, F and G, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation.

1848

Six drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations at line H.I and plan of superstructure, third drawing is of longitudinal section at A.B, fourth drawing is of side elevation, fifth drawing is of sections at E, F and G, sixth drawing is of transverse section at C.D.

12 October 1847

Nine drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at E.F and plan of superstructure, fourth drawing is of part of contract section, fifth drawing is of sections at G, H and I, sixth drawing is of transverse section at C.D, seventh drawing is of fig 2, eighth drawing is of fig 1, ninth drawing is of elevation. Signed by J G Thomson and J H Gallott.

22 August 1848

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at I.K and plan of superstructure, fourth drawing is of sections at E, F, G and H, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations at line H.I and plan of superstructure, third drawing is of longitudinal section at A.B, fourth drawing is of side elevation, fifth drawing is of sections at E, F and G, sixth drawing is of transverse section at C.D. Signed by Isambard Kingdom Brunel and J G Thomson.

12 October 1847

Powered by Preservica
Copyright © Network Rail