086/087/088 - Oxford Worcester and Wolverhampton Railway - Evesham Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Six drawings on one sheet. First drawing is of part of contract plan, second drawing is of part of contract section, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of side elevation and longitudinal section at A.B, fifth drawing is of transverse section at C.D, sixth drawing is of elevation. Signed by J G Thomson and J Moore.

14 June 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation.

14 February 1848

Eleven drawings on one sheet. First drawing is of casting at E, second drawing is of casting at G, third drawing is of plan at M, fourth drawing is of casting at N, fifth drawing is of plan, sixth drawing is of plan, seventh drawing is of casting at F, eighth drawing is of casting at L, ninth drawing is of casting at K, tenth drawing is of casting at I, eleventh drawing is of casting at M.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 30ft span.

1845-1855

Eight drawings on one sheet. First drawing is of cross section no. 9, second drawing is of cross section no. 12, third drawing is of cross section no. 15, fourth drawing is of cross section no. 10, fifth drawing is of cross section no. 13, sixth drawing is of cross section no. 16, seventh drawing is of cross section no. 11, eighth drawing is of cross section no. 14. Copy, Lansdowne House by T. Pugh.

08 January 1848

One drawing on sheet showing plan of superstructure and plan of foundations at level of plinth.

1845-1855

Three drawings on one sheet. First drawing is of sections at E, F and G, second drawing is of plan of foundations at line of rails and plan of superstructure, third drawing is of sections at H, I, K and L. Signed by Isambard Kingdom Brunel and J G Thomson.

09 December 1847

Four drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of elevation, third drawing is of detail of parapet, fourth drawing is of under planking and plan of superstructure. Closed parapet.

1848

Three drawings on one sheet. First drawing is of sections at E, F, G, H and I, second drawing is of plan of foundations taken at level of rails and plan of superstructure, third drawing is of sections at J, K, L, M and N.

1845-1855

Twenty two drawings on one sheet showing [plans and elevations] of iron fixtures.

1845-1855

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at E, F and G, third drawing is of plan of foundations at line H.I and plan of superstructure, fourth drawing is of side elevation, fifth drawing is of transverse section at C.D, sixth drawing is of part of contract section, seventh drawing is of elevation. Signed by Isambard Kingdom Brunel and J G Thomson.

04 August 1847

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of [plan], fourth drawing is of plan of foundations at road line and plan of superstructure, fifth drawing is of section at E, F and G, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation.

1848

Nine drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at E.F and plan of superstructure, fourth drawing is of part of contract section, fifth drawing is of sections at G, H and I, sixth drawing is of transverse section at C.D, seventh drawing is of fig 2, eighth drawing is of fig 1, ninth drawing is of elevation. Signed by J G Thomson and J H Gallott.

22 August 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at I.K and plan of superstructure, fourth drawing is of sections at K, J, I and H, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation, seventh drawing is of sections at G, F and E.

1845-1855

Eight drawings on one sheet. First drawing is of cross section no. 1, second drawing is of cross section no. 3, third drawing is of cross section no. 2, fourth drawing is of cross section no. 6, fifth drawing is of cross section no. 3, sixth drawing is of cross section no. 7, seventh drawing is of cross section no. 4, eighth drawing is of cross section no. 8.

1845-1855

Seven drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F, G and H, third drawing is of longitudinal section, fourth drawing is of plan of foundations at level of rails and plan of superstructure, fifth drawing is of transverse section at A.B, sixth drawing is of sections at I, J, K, L and M, seventh drawing is of side elevation.

1845-1855

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation. Pencil annotation, 'signed by Isambard Kingdom Brunel.'

09 February 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundation at line E.F and plan of superstructure, fourth drawing is of sections at G, H, I and K, fifth drawing is of part of contract section, sixth drawing is of transverse section at C.D, seventh drawing is of end elevation. 12ft span.

20 August 1847