Object Type: Folder
In Folder: Historical Engineering Collection
Various drawings on sheet showing plans and elevations of joints, bolts and fixtures.
1845-1855
Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at the line E.F and plan of superstructure, fourth drawing is of sections at G, H and I, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation. Signed by J G Thomson.
20 May 1848
Four drawings on one sheet. Elevations and sections of bridge. Pencil noting reads 'Parish of Offenham for Mr Thomson, drawn by Mr Dangerfield'. Second noting reads 'No use for Mr Thompson or Mr Baylis'
1848
Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at L.M and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Signed by J G Thomson and F P Webb.
14 August 1847
Six drawings on one sheet. Evesham Division of Oxford and Worcester Contract, Drawing No. 7. First drawing is of an elevation, second drawing is of plan of superstructure with plan of foundations, third drawing is of longitudinal section at CD, fourth drawing is of transverse section at AB, fifth drawing is of sections at E, F, G and H, sixth drawing is of side elevation. 30ft span.
1848
Two drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of plan of foundations at E.F and plan of superstructure. Signed by J G Thomson. 'altered by Mr Brunel - not to be built'. Triple arch bridge. Main arch: 30ft span, side arches: 20ft span.
27 July 1847
Six drawings on one sheet. First drawing is of longitudinal section at A.B and elevation, second drawing is of end elevation, third drawing is of transverse section at C.D, fourth drawing is of part of contract section, fifth drawing is of plan of foundations and plan of superstructure, sixth drawing is of part of contract plan. Triple arch bridge. Main span 30ft. Two side arches 28ft span. Signed by J H Gallott, Evesham.
18 May 1848
Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at E, F and G, third drawing is of plan of foundations at line H.I and plan of superstructure, fourth drawing is of side elevation, fifth drawing is of transverse section at C.D, sixth drawing is of part of contract section, seventh drawing is of elevation.
1845-1855
Various drawings on sheet showing plans and elevations.
1845-1855
Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at E, F and G, third drawing is of plan of foundations at line H.I and plan of superstructure, fourth drawing is of side elevation, fifth drawing is of transverse section at C.D, sixth drawing is of part plan of contract, seventh drawing is of elevation. 39 degree angle of skew.
1845-1855
Ten drawings on one sheet. First drawing is of elevation, second drawing is of elevation of abutment wall, third drawing is of plan of foundations at E.F, fourth drawing is of elevation, fifth drawing is of section of abutment wall at A.B, sixth drawing is of sections at C.D, seventh drawing is of section of pier, eighth drawing is of elevation of trussel and pier, ninth drawing is of side elevation, tenth drawing is of plans of foundations of pier at A.B.
19 January 1848
Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at line of rails and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. 31ft 6" span.
1845-1855
Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at road line and plan of superstructure, fourth drawing is of sections at E.F, fifth drawing is of transverse section at C.D, sixth drawing is of part of contract section, seventh drawing is of side elevation.
1848
Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at I, H, G, F and E, third drawing is of sections at N, M, L, K and J, fourth drawing is of plan of foundations at plinth level and plan of superstructure, fifth drawing is of side elevation, sixth drawing is of transverse section at C.D, seventh drawing is of elevation.
1848
Eight drawings on one sheet. First drawing is of elevation, second drawing is of 1'6" culvert, third drawing is of longitudinal section at A.B, fourth drawing is of 2'6" culvert, fifth drawing is of transverse section at C.D, sixth drawing is of 3'0" culvert, seventh drawing is of fig 1, eighth drawing is of fig 2.
1848
Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation.
1848
Nine drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations at level of rails and plan of superstructure, third drawing is of section at E, fourth drawing is of longitudinal section at A.B, fifth drawing is of section at F, sixth drawing is of transverse section at C.D, seventh drawing is of sections at G.H, eighth drawing is of side elevation, ninth drawing is of sections at I.J. 30ft span.
1848
Seven drawings on one sheet. First drawing is of part of contract plan, second drawing is of part of contract section, third drawing is of longitudinal section at A.B, fourth drawing is of longitudinal section at A.B, fifth drawing is of plan of foundations and plan of superstructure, sixth drawing is of elevation, seventh drawing is of transverse section at C.D. Signed by J G Thomson.
22 June 1848