search archive
browse archive Up

113 - Birmingham and Oxford Junction Railway - Main Line Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

24 small drawings on 1 sheet. Drawings of Culvert showing elevations, transverse section, longitudinal section and plan. Signed by Isambard Kingdom Brunel and Samuel Moreton Peto.

[15 March 1852]

5 drawings on 1 sheet showing cross section drawings of Harbury Embankment no.1, 2, 4-8. Signed by Isambard Kingdom Brunel and Samuel Moreton Peto.

[15 March 1852]

6 drawings on 1 sheet showing sections of Cuttings no.3-8. Signed by Brunel and Peto.

[15 March 1852]

3 drawings on 1 sheet showing sections of Tunnel and plan at line of rails. Signed by Isambard Kingdom Brunel and Samuel Moreton Peto.

[15 March 1852]

Powered by Preservica
Copyright © Network Rail