search archive
browse archive Up

082/083 - Oxford Worcester and Wolverhampton Railway - Charlbury Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Seven drawings on one sheet. First drawing is of section at A.B, second drawing is of elevation, third drawing is of section at E.F, fourth drawing is of a section of arch on square, fifth drawing is of plan of foundations and plan of superstructure, sixth drawing is of section at C.D, seventh drawing is of end elevation. Technical Information: Overbridge, flying, segmental, 5 degree 30ft angle of skew, voussoirs stone facing

1845-1855

Six drawings on one sheet. First drawing is of elevation of new bridge, second drawing is of plan of new bridge, third drawing is of sections at G.H, fourth drawing is of section of new centre archway, fifth drawing is of elevation, sixth drawing is of cross sections at A, B, C, D, E and F. Technical Information: 5 arch side bridge, road over river and adjoining land. Semi-circular, 16ft Span, 4 ring, brick arch.

20 July 1848

Four drawings on one sheet. First drawing is of plan, second drawing is of sections at A, B and C, third drawing is of elevation, fourth drawing is of sections at D, E, F and G.

24 November 1848

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at ground line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Technical Information: Underbridge, semi-circular, 12ft span, square, 4 ring, brick arch.

09 October 1848

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at G, H, I, J and K, third drawing is of elevation, fourth drawing is of plan of foundations at E.F and plan of superstructure, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation, seventh drawing is of sections on square. Technical Information: Underbridge over river, flying, segmental, 34ft 7 inch span on square, 52 degree angle of skew, 6 ring, brick arch.

04 October 1848

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at E, F, G, H and I, third drawing is of elevation, fourth drawing is of plan of foundations at ground level and plan of superstructure, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation, seventh drawing is of section on square. Technical information: Underbridge over river, flying, segmental, 32ft span on square, 52 degree angle of skew, brick arch.

07 June 1848

Six drawings on one sheet. First drawing is of section at C.D, second drawing is of section at E.F, third drawing is of elevation, fourth drawing is of transverse section at C.D, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of end elevation.

04 July 1848

Six drawings on one sheet. First drawing is of transverse section at A.B, second drawing is of longitudinal section at C.D, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of sections at E.F, fifth drawing is of south elevation, sixth drawing is of end elevation.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at G.H, fourth drawing is of transverse section at C.D, fifth drawing is of plan of foundations at E.F and plan of superstructure, sixth drawing is of end elevation. Technical Information: triple arch underbridge over river; square. Main arch: flying; segmental; 44ft 6inch span. Side arches: drains/culverts; 6ft span; semi-circular; 4 ring.

1845-1855

Six drawings on one sheet. First drawing is of transverse section at A.B, second drawing is of elevation, third drawing is of longitudinal section at C.D, fourth drawing is of plan of foundations at E.F and plan of superstructure, fifth drawing is of end elevation, sixth drawing is of sections at G.H. Technical Information: triple arch underbridge over river; square. Main arch: flying; segmental; 44ft 6inch span. Side arches: drains/culverts; 6ft span; semi-circular; 4 ring.

1845-1855

Three drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at C.D, third drawing is of sections on the square. Technical Information: triple arch underbridge over river; 42 degree angle of skew. Main arch: elliptical; 34ft span on square. Side arches: semi-circular; square; 12ft span; 4 ring.

1845-1855

Five drawings on one sheet. First drawing is of half end elevation and half section at A.B, second drawing is of sections at G.H, third drawing is of plan of foundations at ground level and plan of superstructure, fourth drawing is of sections at K.J.I, fifth drawing is of half section at E.F and half end elevation. Technical Information: triple arch underbridge over river; 42 degree angle of skew. Main arch: elliptical; 34ft span on square. Side arches: semi-circular; 12ft span; 4 ring.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at road line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation. Technical Information: Underbridge over road; semi-circular; square; 12ft span; 4 ring.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of section at E, fourth drawing is of transverse section at C.D, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of end elevation. Technical Information: Overbridge; flying; segmental; 56ft 3 inches span.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of section at E, fourth drawing is of end elevation, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of transverse section at C.D. Technical Information: overbridge; flying; segmental; 49ft 6 inch span; square.

1845-1855

Seven drawings on one sheet. First drawing is of section at G, second drawing is of transverse section, third drawing is of section at H, fourth drawing is of elevation, fifth drawing is of elevation, sixth drawing is of half longitudinal section and half end elevation, seventh drawing is of plan of superstructure and plan of foundations at ground level. Technical Information: triple arch underbridge over river; square. Main arch: semi-circular; 36ft span. Side arches: drains/culverts; semi-circular; 7ft span.

1845-1855

Seven drawings on one sheet. First drawing is of longitudinal section at C.D, second drawing is of elevation, third drawing is of section at G, fourth drawing is of longitudinal section at A.B, fifth drawing is of sections at H.I, sixth drawing is of end elevation and section at E.F, seventh drawing is of plan of foundations at ground level and plan of superstructure. Technical Information: triple arch underbridge over river; square. Main arch: segmental; 34ft span. Side arches: semi-circular; 13ft 3inch span.

1845-1855

Eight drawings on one sheet. First drawing is of longitudinal section at C.D, second drawing is of elevation, third drawing is of section at A.B and section at E.F, fourth drawing is of plan of foundations at ground level and plan of superstructure, fifth drawing is of section at G, sixth drawing is of end elevation and section at E.F, seventh drawing is of section at H, eighth drawing is of section at I. Technical Information: Triple arch underbridge over river; square. Main arch: elliptical; 34ft Span. Side arches: elliptical; 13ft span; 4 ring.

1845-1855

Powered by Preservica
Copyright © Network Rail