search archive
browse archive Up

082/083 - Oxford Worcester and Wolverhampton Railway - Charlbury Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Nine drawings on one sheet. First drawing is of elevation, second drawing is of detail of wrought iron plate at A, third drawing is of longitudinal section at A.B, fourth drawing is of elevation of parapet, fifth drawing is of plan of foundation and plan of superstructure, sixth drawing is of elevations of parapet, seventh drawing is of section at E.F.G, eighth drawing is of transverse section at C.D, ninth drawing is of end elevation. Technical information: Lord Churchill's Riding Way; underbridge; wrought iron girder and timber deck; square; 12ft span.

1845-1855

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at level of road and plan of superstructure, fourth drawing is of section at E, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation, seventh drawing is of section at F.G. Technical information: underbridge; semi-circular; 12ft 6 inch span; square; voussoirs

1845-1855

Twenty eight drawings on one sheet. Drawings one to seven are of elevations, drawings eight to fourteen are of transverse sections, drawings fifteen to twenty one are of longitudinal sections, drawings twenty two to twenty eight are of plans. Signed by R A Rees.

24 June 1848

Six drawings on one sheet. First drawing is of transverse section at A.B, second drawing is of longitudinal section at C.D, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of sections at E.F, fifth drawing is of south elevation, sixth drawing is of end elevation.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at G, F and E, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Technical information: underbridge; square; 12ft span.

06 October 1848

Three drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at C.D, third drawing is of sections on the square. Technical Information: triple arch underbridge over river; 42 degree angle of skew. Main arch: elliptical; 34ft span on square. Side arches: semi-circular; square; 12ft span; 4 ring.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at level of rails and plan of superstructure, fourth drawing is of sections at E, F, G and H, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Initialled by R.G.C.

15 November 1847

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of transverse section at C.D, fifth drawing is of end elevation, sixth drawing is of section at E.F.G. Technical Information: underbridge; semi-circular; voussoirs.

22 May 1848

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at ground line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Technical Information: Underbridge, semi-circular, 12ft span, square, 4 ring, brick arch.

09 October 1848

Six drawings on one sheet. First drawing is of elevation of new bridge, second drawing is of plan of new bridge, third drawing is of sections at G.H, fourth drawing is of section of new centre archway, fifth drawing is of elevation, sixth drawing is of cross sections at A, B, C, D, E and F. Technical Information: 5 arch side bridge, road over river and adjoining land. Semi-circular, 16ft Span, 4 ring, brick arch.

20 July 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of transverse section, fourth drawing is of longitudinal section. 'Abandoned by Peto & Betts'. Technical information: Undertrack Tunnel; 13ft span.

1845-1855

Seven drawings on one sheet. First drawing is of section at G, second drawing is of transverse section, third drawing is of section at H, fourth drawing is of elevation, fifth drawing is of elevation, sixth drawing is of half longitudinal section and half end elevation, seventh drawing is of plan of superstructure and plan of foundations at ground level. Technical Information: triple arch underbridge over river; square. Main arch: semi-circular; 36ft span. Side arches: drains/culverts; semi-circular; 7ft span.

1845-1855

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of sections at G, H, I, J and K, third drawing is of elevation, fourth drawing is of plan of foundations at E.F and plan of superstructure, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation, seventh drawing is of sections on square. Technical Information: Underbridge over river, flying, segmental, 34ft 7 inch span on square, 52 degree angle of skew, 6 ring, brick arch.

04 October 1848

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at G, H, I, K and L, fourth drawing is of plan of superstructure and plan of foundations taken at line E.F, fifth drawing is of plan, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation. Technical Information: underbridge; girder; open iron parapet; 20ft 5" span; 15 degree angle of skew.

05 April 1851

Six drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of elevation, third drawing is of end elevation, fourth drawing is of section at E, fifth drawing is of transverse section at C.D, sixth drawing is of plan of superstructure. Technical Information: Overbridge; flying; segmental; 49ft 6" span; square.

25 September 1848

Three drawings on one sheet. First drawing is of sections at E, F, G, H, L, K, J and I, second drawing is of plan of foundations at M.N and plan of superstructure, third drawing is of section on square. Technical information: overbridge; 28ft span; 50 degree angle of skew; voussoirs.

06 January 1849

Seven drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of elevation, fifth drawing is of section at E, sixth drawing is of sections at F, G and H, seventh drawing is of end elevation. 'Bridge abandoned before Peto & Betts took the contract'. Technical Information: overbridge; 40 degree angle of skew.

17 May 1848

Four drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of longitudinal section at A.B, third drawing is of section at E, F, G, H, J, K and L, fourth drawing is of end elevation. Technical Information: underbridge over river; semi-circular; 50ft span; 20 degree angle of skew; 6 ring; voussoirs.

1845-1855

Powered by Preservica