search archive
browse archive Up

082/083 - Oxford Worcester and Wolverhampton Railway - Charlbury Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at road line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of end elevation. Technical Information: Underbridge over road; semi-circular; square; 12ft span; 4 ring.

1845-1855

Seven drawings on one sheet. First drawing is of elevation, second drawing is of sections at E and F, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of longitudinal section on the square, fifth drawing is of transverse section at C.D, sixth drawing is of longitudinal section at A.B, seventh drawing is of end elevation.

1845-1855

Four drawings on one sheet. First drawing is of end elevation, second drawing is of longitudinal section at A.B, third drawing is of elevation, fourth drawing is of transverse section at C.D. Technical Information: overbridge; 28ft span; 50 degree angle of skew; voussoirs

06 January 1849

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at line of rails and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Technical information: overbridge; elliptical; 28ft span; brick arch and abutments

1845-1855

Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of elevation, third drawing is of side elevation. Technical information: underbridge over river; segmental; flying arch; 45ft span; 31 degree angle of skew; voussoirs.

1845-1855

Four drawings on one sheet. First drawing is of plan, second drawing is of sections at A, B and C, third drawing is of elevation, fourth drawing is of sections at D, E, F and G.

24 November 1848

Six drawings on one sheet. First drawing is of section at C.D, second drawing is of section at E.F, third drawing is of elevation, fourth drawing is of transverse section at C.D, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of end elevation.

04 July 1848

Three drawings on one sheet. First drawing is of plan of foundations at present surface and plan of superstructure, second drawing is of section of arch on square, third drawing is of elevation. Technical information: underbridge over river; segmental; flying arch; 45ft span; 31 degree angle of skew; voussoirs.

1845-1855

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of section at E, fourth drawing is of end elevation, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of transverse section at C.D. Technical Information: overbridge; flying; segmental; 49ft 6 inch span; square.

1845-1855

Eight drawings on one sheet. First drawing is of longitudinal section at C.D, second drawing is of elevation, third drawing is of section at A.B and section at E.F, fourth drawing is of plan of foundations at ground level and plan of superstructure, fifth drawing is of section at G, sixth drawing is of end elevation and section at E.F, seventh drawing is of section at H, eighth drawing is of section at I. Technical Information: Triple arch underbridge over river; square. Main arch: elliptical; 34ft Span. Side arches: elliptical; 13ft span; 4 ring.

1845-1855

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of section at E, fifth drawing is of transverse section, sixth drawing is of end elevation, seventh drawing is of sections at F and G. Singed by W B Lewis.

08 July 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of transverse section, fourth drawing is of longitudinal section.

17 November 1848

Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of section at E, fourth drawing is of plan of superstructure and plan of foundations at O.P, fifth drawing is of section at F, sixth drawing is of transverse section at C.D, seventh drawing is of end elevation. Copied by A Raymond.

08 July 1848

Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of span of arch on square, fourth drawing is of plan of foundation at line of footings and plan of superstructure, fifth drawing is of section, sixth drawing is of end elevation, seventh drawing is of transverse section at C.D, eighth drawing is of sections at F.G. Technical information: underbridge; segmental; 25 degree angle of skew; voussoirs.

1845-1855

Seven drawings on one sheet. First drawing is of longitudinal section at C.D, second drawing is of elevation, third drawing is of section at G, fourth drawing is of longitudinal section at A.B, fifth drawing is of sections at H.I, sixth drawing is of end elevation and section at E.F, seventh drawing is of plan of foundations at ground level and plan of superstructure. Technical Information: triple arch underbridge over river; square. Main arch: segmental; 34ft span. Side arches: semi-circular; 13ft 3inch span.

1845-1855

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of side elevation. Technical information: overbridge; skew angle of 40 degrees; elliptical; 28ft span on square; brick arch.

18 March 1848

Six drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of longitudinal section at A.B, third drawing is of elevation, fourth drawing is of section at E.F, fifth drawing is of plan of superstructure and plan of foundations at ground line, sixth drawing is of side elevation. Technical information: double arch; underbridge over path and river; square; semi-circular and elliptical; 38ft span and 12ft span; voussoirs

03 March 1848

Four drawings on one sheet. First drawing is of elevation, second drawing is of plan of superstructure and plan of foundations, third drawing is of span of arch on square, fourth drawing is of transverse section at C.D. Technical information: underbridge over river; skew angle of 10 degrees; segmental; 45ft span on square; voussoirs.

1845-1855

Powered by Preservica
Copyright © Network Rail