search archive
browse archive Up

082/083 - Oxford Worcester and Wolverhampton Railway - Charlbury Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Seven drawings on one sheet. First drawing is of elevation, second drawing is of end elevation, third drawing is of detail of parapet, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of detail of girder, sixth drawing is of transverse section, seventh drawing is of longitudinal section. All drawn and shaded in pencil.

[1847]

Four drawings on one sheet. First drawing is of sections at E.F, second drawing is of longitudinal section at A.B, third drawing is of section at G.H, fourth drawing is of side elevation. Technical information: underbridge over river; skew angle of 10 degrees; segmental; 45ft span on square; voussoirs.

1845-1855

Powered by Preservica
Copyright © Network Rail