search archive
browse archive Up

094 - Wilts Somerset and Weymouth Railway - Melksham Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Four drawings on one sheet. First drawing is of transverse section at A.B second drawing is of elevation, third drawing is of part of elevation at large, fourth drawing is of plan of piles and plan of superstructure. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Five drawings on one sheet. First drawing is of elevation, second drawing is of cross section, third drawing is of sections at A, B, C and D, fourth drawing is of plan, fifth drawing is of longitudinal section.

1/1/47, 12:00 AM

Nine drawings on one sheet. First drawing is of No. 1 clay embankment, second drawing is of clay cutting No. 6, third drawing is of clay embankment No. 2, fourth drawing is of clay cutting No. 7, fifth drawing is of clay embankment no. 3, sixth drawing is of cuttings and surface forming No. 4, seventh drawing is of brash stone cutting widened for ballast, eight drawing is of level forming from one foot cutting to one foot embankment, eighth drawing is of gravel cutting widened for ballast. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Seven drawings on one sheet. First drawing is of plan, second drawing is of cross section, third drawing is of elevation, fourth drawing is of longitudinal section, fifth drawing is of end elevation, sixth drawing is of part of foundations and plan of superstructure, seventh drawing is of sections at A, B, C, D and E. Timber Deck. Signed by R Budge, 1848.

1/1/48, 12:00 AM

Seven drawings on one sheet. First drawing is of end view, second drawing is of longitudinal section, third drawing is of elevation, fourth drawing is of plan of foundations, fifth drawing is of plan of superstructure, sixth drawing is of sections at A, B and C, seventh drawing is of transverse section. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Six drawings on one sheet. First drawing is of elevation, second drawing is of section A.B, third drawing is of Section at C.D looking from B towards A, fourth drawing is of plan of superstructure, fifth drawing is of section at G, E and F, sixth drawing is of end view. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Seven drawings on one sheet,. First drawing is of section on square and section on skew, second drawing is of elevation, third drawing is of plan, fourth drawing is of section at C.D, fifth drawing is of sections at B, D, E, C and A, sixth drawing is of back elevation, seventh drawing is of plan of foundations and plan of superstructure. R Budge, 1847.

1/1/47, 12:00 AM

Four drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at C.D, third drawing is of transverse section at A.B, fourth drawing is of plan of foundations and plan of superstructure. Signed by Mr Brunel 26 October 1846.

10/26/46, 12:00 AM

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of cross section, fourth drawing is of sections at A.B, fifth drawing is of plan, sixth drawing is of end elevation, seventh drawing is of plan of foundations and plan of superstructure. Signed R Budge, 1848.

1/1/48, 12:00 AM

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, back elevation, third drawing is of details for bolts and fixings, fourth drawing is of plan of foundation, fifth drawing is of centre line of railway, sixth drawing is of transverse section. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Six drawings on one sheet. First drawing is of elevation, second drawing is of section at C.D, third drawings is of plan of superstructure and plan of foundations, fourth drawing is of sections at E, F, G and H, fifth drawing is of section at A.B, sixth drawing is of side elevation.

1/1/45, 12:00 AM

Six drawings on one sheet. First drawing is of plan of superstructure and plan of foundations, second drawing is of longitudinal section, third drawing is of elevation, fourth drawing is of transverse section, fifth drawing is of sections at E, F and G, sixth drawing is of side elevation.

1/1/45, 12:00 AM

Six drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F and G, third drawing is of back elevation, fourth drawing is of section at C.D, fifth drawing is of plan of foundation and plan of superstructure, sixth drawing is of section at A.B. Signed by Isambard Kingdom Brunel and John Pritchard.

4/9/46, 12:00 AM

Three drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of plan of foundations. Signed by Charles B Sperling.

1/1/45, 12:00 AM

Twenty one drawings on one sheet. Drawings one to six are of elevation, drawings seven to eleven are of transverse section, drawings twelve to sixteen are of longitudinal sections, drawings seventeen to twenty one are of plans. 8ft, 3ft, 2ft and 1ft culverts and plan of iron pipe.

1/1/45, 12:00 AM

Five drawings on one sheet. First drawing is of elevation, second drawing is of plan, third drawing is of transverse section, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of cross section. Signed by Richard Bailey.

1/1/45, 12:00 AM

Two drawings on one sheet. First drawing is of back elevation, second drawing is of plan of foundations and plan of superstructure.

1/1/47, 12:00 AM

Six drawings on one sheet. First drawing is of end view, second drawing is of elevation, third drawing is of longitudinal section at A.B, fourth drawing is of sections at A.B, fifth drawing is of cross section, sixth drawing is of plan of foundation and plan of superstructure.

1/1/45, 12:00 AM

Powered by Preservica
Copyright © Network Rail