search archive
browse archive Up

062 - Great Western Railway - Bath Station

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Five drawings on one sheet. First drawing is of cross section thro' passage to 1st and 2nd class ladies "Up Side", second drawing is of skylight bar, third drawing is of section, fourth drawing is of elevation of door to 1st and 2nd class ladies "Up Side", fifth drawing is of a plan. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson.

9/5/95, 11:00 PM

Sixteen drawings on one sheet. Drawings include brackets, details, sections and elevations of down platform covering. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Six drawings on one sheet. All drawings are of sections and girders and details of columns girders &c carrying signal box. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Seven drawings on one sheet. First drawing is of Girder A, second drawing is of Girder D, third drawing is of Girder B, fourth drawing is of Girder C, three other drawings of sections. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Ten drawings on one sheet. First drawing is of elevation toward luggage passage, second drawing is of elevation in cloak room, third drawing is of capping to dado, fourth drawing is of elevation in cloak room, fifth drawing is of elevation toward luggage passage, sixth drawing is of a plan, seventh drawing is of section thro' hinged flaps A-A, eighth drawing is of side and front elevation, ninth drawing is of section thro' hinged flaps Z-Z, tenth drawing is of a plan. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Nine drawings on one sheet. First drawing is of section at B.B., second drawing is of section at C.C., third drawing is of section thro' 1st and 2nd Class Ladies, fourth drawing is of plan of skylight over passageway, fifth drawing is of plan at platform level showing the existing roof to be moved, sixth drawing is of back elevation of new waiting room, seventh drawing is of an elevation, eighth drawing is of section of stairs, ninth drawing is of plan of stairs.

12/31/69, 11:00 PM

Four drawings on one sheet of platform covering steel work. Third drawing is of plan at girder level, fourth drawing is of plan under down platform.

2/3/95, 11:00 PM

Twelve drawings on one sheet. Drawings are of sections, plans and cross sections. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson.

9/5/95, 11:00 PM

Undated track layout at Bath.

12/31/34, 11:00 PM

Eleven drawings on one sheet. Drawings include sections, columns, details and longitudinal sections of up platform covering. Engineer's Office Paddington, signed by JW Pattinson and W Pattinson.

9/5/95, 11:00 PM

Sixteen drawings on one sheet. Drawings are of sections, girders and plans for girders and columns in booking hall. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Seventeen drawings on one sheet of details of Bath Station. Drawings include details of sections, elevations towards cloak room, plan of counter at end of cloak room, framing and lifting sash, ticket office desk, and various elevations. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson, [Witon Slimmer and Laurel Hieser].

2/10/95, 11:00 PM

Fifteen drawings on one sheet. Drawings include details of foundations, details, stancheons and columns of sliding door and cast iron stancheons. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson.

9/5/95, 11:00 PM

Six drawings on one sheet. First drawing is of Section A.A., second drawing is of girder S, third drawing is of section B.B., fourth drawing is of cantilever, fifth drawing is of sectional plan C.C, sixth drawing is of inside elevation of girder. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Four drawings on one sheet of details of frame to new 3rd class waiting room. First drawing is of section thro eaves cutter at end, second drawing is of cross section, third drawing is of elevation, fourth drawing is of part plan of timber framing. The contractor to be responsible for the accuracy of all leading dimensions. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson, [Witon Slimmer and Laurel Hieser].

9/5/95, 11:00 PM

Sixteen drawings on one sheet. Drawings are of sections, details, purlins and longitudinal sections. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Eleven drawings on one sheet. Drawings are of girders, sectional plans and sections. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Twenty three drawings on one sheet. Drawings include drawings of sections, columns, and details of down platform covering. Engineer's Office Paddington West, signed by JW Pattinson and W Pattinson

9/5/95, 11:00 PM

Powered by Preservica
Copyright © Network Rail