031A - Britannia Bridge

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing section of tower next to shore on line E-F and front elevation of towers next to shore

[1846-1848]

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing transverse section and front elevation of Shore Tower

06 July 1848

6 drawings on 1 sheet. Working drawing of the Britannia Bridge showing sections of towers, section through vestibule, plan and elevation of rear of tower

23 July 1848

1 drawing on 1 sheet. Working drawing for the Britannia Bridge showing side elevation of temple finishing Shore Towers

06 July 1848

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing front elevation and side elevation of tower and winged wall

February 1848

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing front and side elevations of Carnarvon Tower

01 March 1848

5 drawings on 1 sheet. Working drawing of the Britannia Bridge showing sections, plan of tower and elevation of rear of tower

23 February 1848

Four drawings on one sheet. Drawing No. 6 for Contract No. 10 Britannia Bridge. First drawing is of plan at letter b, second drawing is of plan at letter c, third drawing is of plan at letter a, fourth drawing is of plan at letter d. This is the drawing No. 6 as referred to in the "Contract No. 10 Britannia Bridge Contract" the day made and entered into by us with the Chester and Holyhead Railway Company. Signed by Benjamin [T] Nowell, John Hemingway, J B Hemingway and Charles Pearson.

May 1846

1 drawing on 1 sheet. Working drawing of the Britannia Bridge showing the plan of Shore Tower at A & B

06 July 1848

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing sections of temple finish for the Middle and Shore Towers

[1848]

1 drawing on 1 sheet. Working drawing of the Britannia Bridge showing longitudinal section of temple finishings on Shore Tower

06 July 1848

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing side elevation and section of Centre Tower and Towers next to shore

[1846-1848]

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing general plan of level of the tube and general plan of high water level

[1846-1848]

Two drawings on one sheet of end tower and wing wall Anglesea side. Drawing No. 10 for Contract No. 10 Britannia Bridge. First drawing is of transverse section of wing, second drawing is of elevation of end tower and wing. This is the drawing No. 10 as referred to in the "Contract No. 10 Britannia Bridge Contract" the day made and entered into by us with the Chester and Holyhead Railway Company. Signed by Benjamin [T] Nowell, John Hemingway, J B Hemingway and Charles Pearson

May 1846

1 drawing on 2 sheets. Working drawing for the Britannia Bridge showing elevation of Bridge.

February 1848 - March 1848

3 drawings on 1 sheet. Working drawing of the Britannia Bridge showing section of parapet cornice frieze and lintol entrance front for the Abutment Tower

[1846-1848]

Drawing No. 4 for Contract No. 10 Britannia Bridge. Drawing is of a side elevation of one of the middle towers. This is the drawing No. 4 as referred to in the "Contract No. 10 Britannia Bridge Contract" the day made and entered into by us with the Chester and Holyhead Railway Company. Signed by Benjamin [T] Nowell, John Hemingway, J B Hemingway and Charles Pearson

May 1846

2 drawings on 1 sheet. Working drawing of the Britannia Bridge showing section on the line A-B and profile

01 March 1848