search archive
browse archive Up

029/030 - Great Western Railway - Box Tunnel Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of Box Tunnel ventilation shafts. Five drawings on one sheet. Working Drawing No. 1 for Contract No. 4 Box Tunnel. First drawing is of transverse section at AB, second drawing is of longitudinal section at EF, third drawing is of plan at GH, fourth drawing is of plan at IK, fifth drawing is of transverse section at CD.

07 July 1838

Masonry bridge over line. Two drawings on one sheet. Drawing No. 1 for Contract No. 6 Box Extension. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure.

1835-1845

Long Section of Box Tunnel. Two drawings on one sheet. Drawing No. 1 for Contract No. 5 Box Tunnel. First drawing is of a plan showing the line of the tunnel including the positioning of the shafts, second drawing is of a cross section of the area of land showing the locations for each contract and the position of shafts. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Ventilation Shaft for Box Tunnel. Two drawings on one sheet. Drawing No. 3 for Contract No. 1 Box Tunnel. First drawing is of a section, second drawing is of a plan.

07 July 1838

Long Section of Box Tunnel. Two drawings on one sheet. Drawing No. 1 for Contract No. 6 Box Tunnel. First drawing is of a plan showing the line of the tunnel including the positioning of the shafts, second drawing is of a cross section of the area of land showing the locations for each contract and the position of shafts. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Long section of Box Tunnel. Two drawings on one sheet. Drawing No. 1 for Contract No. 4 Box Tunnel. First drawing is of a plan showing the line of the tunnel including the positioning of the shafts, second drawing is of a cross section of the area of land showing the locations for each contract and the position of shafts. The drawing is annotated but part of it is missing. This is one of the drawings referred to in the con[tract] between the Great Western Railway Company and [George Burge] bearing date the 30th day of June 1838.

30 June 1838

Cross sections of Box tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 4 Box Tunnel. First drawing is of fig. 1 of a section of the tunnel, second drawing is of fig. 2 of a section of the tunnel, third drawing is of fig. 3 of a section of the tunnel.

07 July 1838

Details of masonry bridge over line. Three drawings on one sheet. Drawing No. 1A for Contract No. 6 Box Extension. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at EF.

1835-1845

Cross sections of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 4 Box Tunnel. First drawing is of fig. 1 of a section of the tunnel, second drawing is of fig. 2 of a section of the tunnel, third drawing is of fig. 3 of a section of the tunnel. This is the drawing referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the 30th day of June 1838. The drawing is signed by Brunel and George Burge.

30 June 1838

Cross sections of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 and 6. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.

07 July 1838

Cross sections of Box tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 4 Box Tunnel. First drawing is of fig. 1 of a section of the tunnel, second drawing is of fig. 2 of a section of the tunnel, third drawing is of fig. 3 of a section of the tunnel.

07 July 1838

Seven drawings on one sheet of ornamental details for Box Tunnel. First drawing is of an entablature, second drawing is of elevation of truss, third drawing is of balustrading, fourth drawing is of key stone side elevation, fifth drawing is of front elevation, sixth drawing is of spandril, seventh drawing is of bustics.

07 July 1838

Cross section of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 Box Tunnel. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Cross sections of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 4 Box Tunnel. First drawing is of fig. 1 of a section of the tunnel, second drawing is of fig. 2 of a section of the tunnel, third drawing is of fig. 3 of a section of the tunnel.

07 July 1838

Cross sections of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 and 6. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.

07 July 1838

Cross Sections of Box tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 and 6. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Details of Box Tunnel ventilation shafts. Four drawings on one sheet. Drawing No. 3 for Contract No. 4, 5 and 6 Box Tunnel. First drawing is of a transverse section at AB, second drawing is of a longitudinal section at CD, third drawing is of a plan at GH, fourth drawing is of a plan at EF.

07 July 1838

Details of Box Tunnel ventilation shafts. Four drawings on one sheet. Drawing No. 3 for Contract No. 4, 5 and 6 Box Tunnel. First drawing is of a transverse section at AB, second drawing is of a longitudinal section at CD, third drawing is of a plan at GH, fourth drawing is of a plan at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Powered by Preservica
Copyright © Network Rail