search archive
browse archive Up

029/030 - Great Western Railway - Box Tunnel Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Three drawings on one sheet. First drawing is of an elevation of the East Portal of Box Tunnel, second drawing is of longitudinal section at AB, third drawing is of plan of superstructure

07 July 1838

Details of Box Tunnel ventilation shafts. Four drawings on one sheet. Drawing No. 3 for Contract No. 4, 5 and 6 Box Tunnel. First drawing is of a transverse section at AB, second drawing is of a longitudinal section at CD, third drawing is of a plan at GH, fourth drawing is of a plan at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Details of masonry bridge over line. Three drawings on one sheet. Drawing No. 1A for Contract No. 6 Box Extension. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at EF.

1835-1845

Seven drawings on one sheet of ornamental details for Box Tunnel. First drawing is of an entablature, second drawing is of elevation of truss, third drawing is of balustrading, fourth drawing is of key stone side elevation, fifth drawing is of front elevation, sixth drawing is of spandril, seventh drawing is of bustics.

07 July 1838

Masonry bridge over line. Two drawings on one sheet. Drawing No. 1 for Contract No. 6 Box Extension. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure.

1835-1845

Longitudial section showing progress of works etc to 28 June 1839

28 June 1839

Longitudial section showing progress of works

undated

Proposed centring for the strengthening of Box Tunnel. Seven drawings on one sheet. First drawing is of cross section, second drawing is of a sectional elevation, third drawing is of detail at C, fourth drawing is of detail at A, fifth drawing is of section at B, sixth drawing is of plan from D, seventh drawing is of detail at E. Signed by James Charles Inglis.

14 June 1895

Details of Box Tunnel portal. Two drawings on one sheet. First drawing is of sections at CD, EF, GH and IK, second drawing is of plan of foundations at LM with superstructure.

07 July 1838

Details of Box Tunnel ventilation shafts. Four drawings on one sheet. Drawing No. 3 for Contract No. 4, 5 and 6 Box Tunnel. First drawing is of a transverse section at AB, second drawing is of a longitudinal section at CD, third drawing is of a plan at GH, fourth drawing is of a plan at EF.

07 July 1838

Three drawings on one sheet. [Half drawing is missing]. Details of Bridge [at Box?]. First drawing is of longitudinal section at AB, second drawing is of plan of superstructure, third drawing is of transverse section at EF.

1835-1845

Cross sections of Box Tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 and 6. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.

07 July 1838

Long Section of Box Tunnel. Two drawings on one sheet. Drawing No. 1 for Contract No. 6 Box Tunnel. First drawing is of a plan showing the line of the tunnel including the positioning of the shafts, second drawing is of a cross section of the area of land showing the locations for each contract and the position of shafts. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Longitudial section showing progress of works

undated

Six drawings on one page. First three drawings are of sections of Box Tunnel, fourth and fifth drawings are of sections of Newport Tunnel, sixth drawing is of Marley Tunnel.

undated

Cross Sections of Box tunnel. Three drawings on one sheet. Drawing No. 2 for Contract No. 5 and 6. First drawing is of section No. 1, second drawing is of section No. 2, third drawing is of section No. 3.This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Ventilation Shaft of Box Tunnel. Four drawings on one sheet. Drawing No. 3 for Contract No. 5 Box Tunnel. First drawing is of fig. 1 transverse section at AB, second drawing is fig. 2 longitudinal section at CD, third drawing is of fig 4. plan at GH, fourth drawing is fig 3 plan at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. George Burge bearing date the seventh day of July 1838. The drawing is signed by Brunel and George Burge.

07 July 1838

Two drawings on one sheet. First drawing is of an elevation of Box Tunnel West Front, second drawing is of plan of foundations at AB.

07 July 1838

Powered by Preservica
Copyright © Network Rail