search archive
browse archive Up

ATA-2021-Stoud Valley Viaducts

Object Type: Folder
In Folder: Virtual Searchroom


View Gallery

Title
Description
Date

1 drawing showing plan, section and elevation of old and new Bourne Viaduct

1836-1923

1 drawing showing plan, section and elevation of old and new Frampton Viaduct

1836-1923

Details of Capels Viaduct showing new masonary and iron viaduct as well as old timber structure in relation ot the canal and mill pond. On the GWR Cheltenham Branch. Seven drawings on one sheet. First drawing of Capels Viaduct, second drawing of transverse section thro' crown of Arch, third drawing of transverse section thro' wrought iron girder, fourth drawing of transverse section through pier, fifth drawing of elevation of old timber structure, sixth drawing of transverse section at pier of old timber viaduct, seventh drawing a general plan of the plan of the old timber structure.

[1868]

Details of St Marys Viaduct.Five drawings on one sheet. First drawing is of elevation of truss, second drawing is of wrought iron rod, third drawing is of plan, fourth drawing is of casting at A, fifth drawing is of casting at B.

[1840-1849]

Details of Bridge. Three drawings on one sheet. Drawing No. 8 for Contract No. 3.First drawing is of longitudinal section, second drawing is of transverse section, third drawing is of elevation. Drawing is signed by Isambard Kingdom Brunel and Jonathan W Nowell.

24 June 1843

Details of original timber Bourne Viaduct. Three drawings on one sheet, first drawing is of elevation of truss, second drawing is of transverse section, third drawing is of plan.

[1840-1849]

Powered by Preservica
Copyright © Network Rail