search archive
browse archive Up

Oxford Worcester and Wolverhampton Railway Worcester Contract No.2



Title
Description
Date

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at road line and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

[04 August 1846]

Two drawings on one sheet. First drawing is of sections of walls at K, J, I, H, G, F and E, second drawing is of plan of foundations with plan of superstructure.

1845-1850

Eight drawings on one sheet. First drawing is of sections at J, K, L and M, second drawing is of sections at N.O, third drawing is of elevation, fourth drawing is of side elevation, fifth drawing is of plan of foundations at level of rails and plan of superstructure, sixth drawing is of transverse section at C.D, seventh drawing is of longitudinal section, eighth drawing is of sections at I, H, G, F and E.

[04 August 1846]

Seven drawings on one sheet. Drawing No. 7A for Worcester Contract No. 2. First drawing is of end elevation, second drawing is of middle truss, third drawing is of casting at J, fourth drawing is of casting at J, fifth drawing is of section of plate, sixth drawing is of transverse section at CD, seventh drawing is of sections at G, H, J, K, L and M.

[04 August 1846]

Eleven drawings on one sheet. Drawing No. 7 for Worcester Contract No. 2. Drawings are of elevations, transverse sections, castings of iron work, plans and sections.

[04 August 1846]

Eight drawings on one sheet. First drawing is of sections at J, K, L and M, second drawing is of sections at N and O, third drawing is of elevation, fourth drawing is of side elevation, fifth drawing is of plan of foundations at level of rails and plan of superstructure, sixth drawing is of transverse section at C.D, seventh drawing is of longitudinal section at A.B, eighth drawing is of sections at I, H, G, F and E.

[04 August 1846]

Six drawings on one sheet. First drawing is of transverse section at C.D, second drawing is of elevation, third drawing is of plan of foundations at level of rails and plan of superstructure, fourth drawing is of sections at E, F, G and H, fifth drawing is of side elevation, sixth drawing is of longitudinal section at A.B.

[04 August 1846]

Seven drawings on one sheet. First drawing is of end elevation, second drawing is of middle truss, third drawing is of casting at J, fourth drawing is of casting at F, fifth drawing is of section of plate, sixth drawing is of transverse section at C.D, seventh drawing is of sections at G, H, J, K, L and M.

1845-1850

Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of transverse section at C.D, fifth drawing is of side elevation.

[04 August 1846]

Six drawings on one sheet. First drawing is of plan of foundations at H.I and plan of superstructure, second drawing is of longitudinal section at A.B, third drawing is of elevation, fourth drawing is of sections at G, F and E, fifth drawing is of side elevation, sixth drawing is of transverse section at C.D.

[04 August 1846]

Six drawings on one sheet. First drawing is of plan of foundations at H.I on section and plan of superstructure, second drawing is of longitudinal section at A.B, third drawing is of elevation, fourth drawing is of sections at G, F and E, fifth drawing is of side elevation, sixth drawing is of transverse section at C.D.

[04 August 1846]

Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of section at E, fourth drawing is of plan of foundations at line of rails and plan of superstructure, fifth drawing is of sections at F.G, sixth drawing is of transverse section at C.D, seventh drawing is of side elevation.

1845-1850

Six drawings on one sheet. First drawing is of plan of foundations at road line and plan of superstructure, second drawing is of longitudinal section at A.B, third drawing is of elevation, fourth drawing is of sections at E, F and G, fifth drawing is of side elevation, sixth drawing is of transverse section at C.D.

[04 August 1846]

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at E.F on section and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

1845-1850

Three drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure.

1845-1850

Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations at E.F and plan of superstructure, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.

1845-1850

Sixteen drawings on one sheet. Drawing No. 8 for Worcester Contract No. 2. Drawings are of elevations, transverse sections, longitudinal sections and plan of foundations and superstructure for 3 foot culvert and a two foot culvert.

[04 August 1846]

Powered by Preservica
Copyright © Network Rail