search archive
browse archive Up

096 - Wilts Somerset and Weymouth Railway - Bradford and Bathampton Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Nine drawings on one sheet. First drawing is of elevation of parapet, second drawing is of elevation, third drawing is of longitudinal section at A.B, fourth drawing is of plan, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of sections at C, D and E, seventh drawing is of section, eighth drawing is of transverse section at I.K, ninth drawing is of side elevation.

1845-1860

Two drawings on one sheet, first drawing is a general plan showing the canal and towpath, second drawing is of elevation.

07 April 1855

Five drawings on one sheet. First drawing is of cross section at A south side, second drawing is of cross section at A north side, third drawing is of cross section at B south side, fourth drawing is of cross section at B north side, fifth drawing is of plan of south wing. Signed by Robert Pearson Brereton at 18 Duke Street.

27 September 1855

Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of plan, fourth drawing is of sections at E, F and G, fifth drawing is of section at H, sixth drawing is of transverse section, seventh drawing is of end view, eighth drawing is of plan.

20 July 1848

Six drawings on one sheet. First drawing is of elevation, second drawing is of casting at A, third drawing is of casting at B, fourth drawing Is of half plan at A.A, fifth drawing is of half plan at B, sixth drawing is of section at C.D.

1848

Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of transverse section, fourth drawing is of side elevation, fifth drawing is of elevation, sixth drawing is of cross sections at A, B, C and D, seventh drawing is of plan of superstructure, eighth drawing is of plan of foundations.

1855-1860

Six drawings on one sheet. First drawing is of elevation, second drawing is of section at A.B, third drawing is of plan on road line, fourth drawing is of sections at E, F and G, fifth drawing is of section at C.D, sixth drawing is of side elevation.

July 1848

Nine drawings on one sheet. First drawing is of elevation, second drawing is of inside girder, half length, third drawing is of transverse section C.D, fourth drawing is of outside girder, half length, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of enlargement of section and enlargement of railing, seventh drawing is of longitudinal section at A.B, eighth drawing is of plan, ninth drawing is of end elevation.

1847

Seven drawings on one sheet. First drawing is of elevation, second drawing is of section at A.B, third drawing is of [plan], fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of sections at E, F and G, sixth drawing is of section at C.D, seventh drawing is of side elevation.

1847

Seven drawings on one sheet. First drawing is of elevation, second drawing is of plan, third drawing is of section at A.B, fourth drawing is of plan, fifth drawing is of transverse section at C.D, sixth drawing is of longitudinal section, seventh drawing is of section at E.F.

12 August 1848

Twenty four drawings on one sheet. Drawings one to six are of elevation, drawings seven to twelve are of transverse sections, drawings thirteen to eighteen are of longitudinal sections, drawings nineteen to twenty four are of plans. 2ft, 3ft, 3ft 6", 5ft, 6ft and double 5ft culverts.

1855-1860

Four drawings on one sheet. First drawing is of cross section concreted, second drawing is of cross section of shaft, third drawing is of longitudinal section, fourth drawing is of cross section of heading. 18 Duke Street. Signed by Robert Pearson Brereton.

18 April 1855

Nine drawings on one sheet. First drawing is of elevation, second drawing is of transverse section, third drawing is of cross section at A, fourth drawing is of [plan], fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of half elevation, seventh drawing is of half transverse section, eighth drawing is of longitudinal section, ninth drawing is of end elevation.

1845-1860

Six drawings on one sheet. First drawing is of longitudinal section, second drawing is of transverse section of length excavated and transverse section of arch turned, third drawing is of plan, fourth drawing is of section of wing at C, fifth drawing is of elevation, sixth drawing is of section of wing. Includes five paragraphs of writing entitled 'Mode of Proceeding with the Work'.

1855-1860

Two drawings on one sheet. First drawing is of plan showing stage, incline and heading for concrete, second drawing is of plan.

1855-1860

Three drawings on one sheet. First drawing is of [elevation], second drawing is of [plan], third drawing is of [plan].

1845-1860

One drawing on sheet showing [elevation]. Signed 'LNC 26 Feb 1856'.

26 February 1856

Powered by Preservica
Copyright © Network Rail