search archive
browse archive Up

020 - Great Western Railway Contract 3B

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of Bridge. Five drawings on one sheet of bridge. Drawing No. 8 for Contract No. 3B. First drawing is of an elevation, second drawing is of longitudinal section at AB, thrid drawing is of transverse section at CD, fourth drawing is of a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF.

June 1836

Details of Culverts. Twelve drawings on one sheet. Drawing No. 7 for contract No. 3B. First drawing is of an elevation, second drawing is of transverse section, third drawing of elevation, fourth drawing of transverse section, fifth drawing of elevation, sixth drawing of a transverse section, seventh drawing is of a plan, eight drawing is of longitudinal section, ninth drawing is of plan, tenth drawing is of longitudinal section, eleventh drawing is of plan, twelfth drawing is of longitudinal section.

June 1836

Details of Cross Post Gate Bridge. Eight tracing on one sheet. First drawing is of section of foundations, second drawing is of bearing on wall at section E, third drawing is of sections of retaining wall at A.B.C.D.

08 May 1839

Details of Bridge. Six drawings on one sheet. Working drawing No. 8E for Contract No. 3B. First drawing is of south elevation, second drawing is of north elevation, third drawing is of sections through AB, fourth drawing is of side elevation and [se]ction of wing wall through CD, fifth drawing is of general plan including plan of superstructure and plan of foundations at GH, sixth drawing is of section through EF.

June 1836

Details of Bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan of superstructure and plan of foundations, fifth drawing is of transverse section at E.F.

June 1836

Details of Bridge. Five drawing on one sheet of bridge. Drawing No. 6 for Contract No. 3B. First drawing is of an elevation, second drawing is of longitudinal section at AB, thrid drawing is of transverse section at CD, fourth drawing is of a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. [Illegible second half of title]

June 1836

Details of Bridge. Five drawings on one sheet of bridge. Drawing No. 8 for Contract No. 3B. First drawing is of an elevation, second drawing is of longitudinal section at AB, thrid drawing is of transverse section at CD, fourth drawing is of a general plan including plan of foundations and plan of superstructure, fifth drawing is of transverse section at EF. [Large illegible signature in top left hand corner]

June 1836

Details of Cross Gate Bridge. Seven tracing on one sheet. First drawing is of longitudinal section at AB, second drawing is of plan of foundations, third drawing is of sections at E, F, G and H, fourth drawing is of elevation, fifth drawing is of elevation, sixth drawing is of elevation of end girder and plan, seventh drawing is of transverse section at C.D.

June 1836

Details of Bridge. Five drawings on one sheet. Drawing No. 4A for Contract No. 3B. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of a general plan including plan of superstructure and plan of foundations, fifth drawing is of transverse section at EF. Annotation on drawing reads "to be ten feet above the line of rails at the bridge then [face] to this lead of the line of the [face] of the rails at thirty feet on east side [for] west side over the other retaining wall.

June 1836

Powered by Preservica
Copyright © Network Rail