Object Type: Folder
In Folder: Historical Engineering Drawings
One drawing showing embankments and cuttings for the contract
12/31/35, 11:00 PM
Details of Bridges. Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section, sixth drawing is of transverse section is of transverse section at C.D, seventh drawing is of transverse section. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Seven drawings on one sheet. Drawing No. 6 for Contract No. 1. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section, sixth is transverse section C.D and Seventh is a transverse section.
12/31/35, 11:00 PM
Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E.F.G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation.
12/31/35, 11:00 PM
Details of Bridges. Five drawings on one sheet. First drawing is of elevation, second drawing is of transverse section at A.B, third drawing is of sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section at C.D. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Details of Bridges. Four drawings on one sheet. Drawing Nos. 7, 10, 14 and 15 for Contract No. 1. First drawing is of elevation, second drawing is of side elevation and longitudinal section at A.B, third drawing is of transverse section at C.D, fourth drawing is of general plan of foundations and plan of superstructure.
12/31/35, 11:00 PM
Details of Bridges. Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at E.F. and G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section, sixth drawing is of transverse section at C.D, seventh drawing is of transverse section. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Details of Bridges. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at E.F, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at C.D. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Seven drawings on one sheet. Drawing No. 4 for Contract No. 1. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is Sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section, sixth is transverse section at C.D. and seventh is a transverse section.
12/31/35, 11:00 PM
Details of Bridges. Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E.F.G, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Six drawings on one sheet. Drawing No. 12 for Contract No. 1. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan of foundations and plan of superstructure, fourth drawing is of sections at E.F.G, fifth drawing is of Transverse section at C.D, sixth drawing is of side elevation.
12/31/35, 11:00 PM
Details of Culverts. Drawing of various elevations, longitudinal sections, plans and transverse sections. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Details of Bridges. Six drawings on one sheet. First drawing is of elevation, second drawing is of elevation, third drawing is of transverse section, fourth drawing is of end elevation, fifth drawing is of transverse section at A.B, sixth drawing is of plan of foundations and plan of superstructure. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Seven drawings on one sheet. Drawing No. 8 for Contract No. 1. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of Sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of longitudinal section, sixth drawing is of transverse section at C.D, seventh drawing is of transverse section.
12/31/35, 11:00 PM
Details of bridge. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse section at E.F, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at C.D. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Details of Bridges. Six drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at E.F.G, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at C.D, sixth drawing is of side elevation. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM
Seven drawings on one sheet. Drawing No. 11 for Contract No. 1. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of sections at E.F.G, fourth drawing is of plan of foundations and plan of infrastructure, fifth drawing is of longitudinal section, sixth drawing is of transverse section at C.D, seventh drawing is of transverse section.
12/31/35, 11:00 PM
Details of Bridges. Five drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of transverse section at A.B, fourth drawing is of longitudinal section at C.D, fifth drawing is of sections at E.F.G. Drawing is signed by Isambard Kingdom Brunel and G Mcleod.
12/31/35, 11:00 PM