search archive
browse archive Up

053 - Great Western Railway Slough Station

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Four drawings on one sheet. Drawings are for the departure of Slough Station. First drawing is of longitudinal section at AB, second drawing is of transverse section at GH, third drawing is of transverse section at CD, fourth drawing is of transverse section at EF.

12/31/34, 11:00 PM

Three drawings on one sheet. First drawing is of section at AA, second drawing is of elevation at EE, third drawing is of detail of bracket D. Drawing is Mr. E. Olander's copy

12/12/82, 11:00 PM

Drawing is of key plan for ironwork. Drawing is signed by Lancaster Owen, [BN Smith] and a witness.

9/11/82, 11:00 PM

Three drawings on one sheet. Drawings are for the departure at Slough Station. First drawing is of front elevation, second drawing is of end elevation from the east, third drawing is of end elevation from the west.

12/31/34, 11:00 PM

Eight drawings on one sheet of plans and details of footbridge. Drawing is Mr. E Olander's copy.

12/12/82, 11:00 PM

Three drawings on one sheet. First drawing is of section at AA, second drawing is of elevation at EE, third drawing is of detail of bracket D. Drawing is signed by Lancaster Owen, [BN Smith] and a witness.

9/11/82, 11:00 PM

Drawing is for the arrival at Slough Station. Drawing is of a plan of the foundations for the station building. Initialled by Brunel.

12/31/34, 11:00 PM

Two drawings on one sheet. First drawing is of elevation of departure building, second drawing is of plan showing booking office, superintendents office, lobby, waiting room, ladies room, parcel office and store room.

12/20/82, 11:00 PM

Drawing is a sketch relating to Slough Station showing railings.

12/31/38, 11:00 PM

Thirteen drawings on one sheet. Drawings are of details of ironwork for covering including intermediate brackets, wall brackets, details of base of column and sectional plans. Drawing is signed by Lancaster Owen, [BN Smith] and a witness.

5/14/82, 11:00 PM

Three drawings on one sheet. First drawing is of elevation towards main line, central platform, second drawing is of elevation towards up relief line, third drawing is of end elevation towards Paddington.

9/3/82, 11:00 PM

Drawing is for departure of Slough Station. Drawing is of plan of ground floor. Plan shows details of [private entrances, first class, second class, lobby, waiting room and ladies waiting room].

12/31/34, 11:00 PM

Four drawings on one sheet. First drawing is of cantilevers for Station Entrances, second drawing is of intermediate cantilevers, third drawing is of details for fixing intermediate cantilevers, fourth drawing is of sections at A, B, C, D, E and F. Drawing is signed by Lancaster Owen, [RN Smith] and a witness.

9/11/82, 11:00 PM

Five drawings on one sheet. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of transverse section at EF, fifth drawing is of transverse section at GH.

12/31/38, 11:00 PM

Five drawings on one sheet. First drawing is of longitudinal section thro' staircase, urinals etc. centre platform, second drawing is of cross section thro' staircase centre platform, third drawing is of parcels and cloak room, fourth drawing is of cross sections end elevation refreshment room, fifth drawing is of a general plan.

9/3/82, 11:00 PM

Drawing is for departure of Slough Station. Drawing is of plan of one pair floor and timbers of roof. Plan shows details of several bed rooms, sitting room, kitchen and closet.

12/31/34, 11:00 PM

Drawing is of an elevation and section of carriage platform.

1/29/83, 11:00 PM

Six drawings on one sheet of brackets, sections and elevations.

12/12/82, 11:00 PM

Powered by Preservica
Copyright © Network Rail