search archive
browse archive Up

043 - Great Western Railway Contract 4S

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of cutting. Two drawings on one sheet. First drawing is of cutting cross sections no. 1 and no. 3, second drawing is of cross section no. 2.

15 June 1839

Details of Bridge. Four drawings on one sheet. Drawing No. 7A for Contract No. 4S. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at GH, fourth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Plan of line crossing the Wilts and Berks Canal. Drawing No. 8 for Contract No. 4S. Drawing is of a plan showing the diversion of the road near the Wilts and Berks Canal. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of a bridge over a canal and a turnpike road. Four drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at G.H, fourth drawing is of transverse section at E.F.

15 June 1839

Details of Cuttings. Two drawings on one sheet. Drawing No. 3 for Contract No. 4S. First drawing is of cutting for cross section No. 1 and 3, second drawing is of cutting for cross section No. 2. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of bridge. One drawing on sheet showing plan of superstructure and plan of foundations.

15 June 1839

Details of embankment. Two drawings on one sheet. Drawing No. 4 for Contract No. 4S. First drawing is of embankment for cross section No. 1, second drawing is of embankment for cross section No. 2 and No. 3. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of bridge. Six drawings on one sheet. Drawing No. 5 for contract No. 4S. First drawing is of elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations, fifth drawing is of plans of superstructure, sixth drawing is of transverse section at EF. Notes on costings on drawings [of building materials].

15 June 1839

Details of a bridge over a canal and a turnpike road. Two drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure.

15 June 1839

Details of bridge. Two drawings on one sheet. First drawing is of elevation, second drawing is of plan of foundations and plan of superstructure.

15 June 1839

Details of Culverts. Four drawings on one sheet. Drawing No. 9 for Contract No. 4S. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of superstructure with plan of foundations. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of Bridge. Four drawings on one sheet. Drawing No. 6 for Contract No. 4S. First drawing is of an elevation with longitudinal section AB, second drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of Bridge. Five drawings on one sheet. Drawing No. 5 for Contract No. 4S. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of bridge. Three drawings on one sheet. First drawing is of longitudinal section at A.B, second drawing is of transverse section at C.D, third drawing is of transverse section at E.F.

15 June 1839

Cross section of line. Drawing No. 2 for Contract No. 4S. Drawing is of a cross section of the land showing embankments and cuttings and details for the line in contract No. 4S starting at North Wilts Canal and passing through Swindon Parish, Stratton St. Margaret's Parish, Stanton Fitz-Warren Parish, Highworth Parish and Shriven[ham]. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Document is indenture made in 1839 between the Great Western Railway Company on the one part and James Thomas Bedborough of Windsor in the county of Wiltshire, contractor, on the other. Contract includes information for the schedule of the works to take place and a description of the works to take place. Document is signed by James Thomas Bedborough.

15 June 1839

Details of Bridge. Two drawings on one sheet. Drawing No. 7 for Contract No. 4S. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and James Thomas Bedborough dated fifteenth day of June 1839. Drawing is signed by James Thomas Bedborough and Brunel.

15 June 1839

Details of bridge for road No. 27 Shrivenham. Five drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of transverse sections at E, F, G and H, fourth drawing is of plan of foundations and plan of superstructure, fifth drawing is of transverse section at C.D.

1835-1845

Powered by Preservica
Copyright © Network Rail