search archive
browse archive Up

025 - Oxford Worcester and Wolverhampton Mickleton Tunnel Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Sections of Mickleton Tunnel portal. Three drawings on one sheet. Drawing No. 8 for Mickleton Tunnel Contract. First drawing is of foundations, second drawing is of sections at F, E, D, C and B, third drawing is of detail of quoins. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Details of Culvert. Four drawings on one sheet. Drawing No. 6 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of a plan, third drawing is of longitudinal section, fourth drawing is of transverse section.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 9 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of longitudinal section at AB, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation. Drawing is signed by William Williams, Samuel Ackroyd and Daniel Price.

11/3/46, 11:00 PM

Long section of Mickleton Tunnel. Drawing No. 2 for Mickleton Tunnel Contract. Drawing is of cross section of the land for the Mickleton Contract showing the location of the tunnel. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Elevation and section of Mikcleton Tunnel Portal. Two drawings on one sheet. Drawing No. 8 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan under coping with plan of superstructure. Drawing is signed by William Williams, Samuel Ackroyde, Daniel Price and Brunel.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 12 (Peg 60) for Mickleton Contract. First drawing is of an elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of longitudinal section at AB, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation. Drawing No. 12 referred to March 26th 1847.

3/25/47, 11:00 PM

Details of Culverts. Four drawings on one sheet. Drawing No. 6 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of a plan, third drawing is of longitudinal section, fourth drawing is of transverse section. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Details of Cutting and Embankment. Four drawings on one sheet. Drawing No. 3 for Mickleton Tunnel Contract. First drawing is of cross section no. 1, second drawing is of cross section no. 2, third drawing is of cross section no. 3, fourth drawing is of cross section no. 4.

11/3/46, 11:00 PM

Details of cutting and embankment. Four drawings on one sheet. Drawing No. 3 for Mickleton Tunnel Contract. First drawing is of cross section no. 1, second drawing is of cross section no. 2, third drawing is of cross section no. 3, fourth drawing is of cross section no. 4. Drawing is signed by William Williams, Samuel Ackroyd and Daniel Price.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 9 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure, third drawing is of longitudinal section at AB, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation.

11/3/46, 11:00 PM

Details of Bridge. Seven drawings on one sheet. Drawing No. 14 for Mickleton Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of sections at E and F, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of section G and H, sixth drawing is of transverse section at CD, seventh drawing is of side elevation. Drawing No. 14 referred to March 26th 1847.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 10 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of longitudinal section at AB, fourth drawing is of transverse section at CD, fifth drawing is of sections at E, F and G, sixth drawing is of side elevation.

11/3/46, 11:00 PM

Cross and Longitudinal section of Mickleton Tunnel. Three drawings on one sheet. Drawing No. 4 for Mickleton Tunnel Contract. First drawing is of section at AB, second drawing is of longitudinal section at CD, third drawing is of plan at line of rails. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 7 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of longitudinal section at CD, fourth drawing is of transverse section at AB, fifth drawing is of side elevation. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Elevation of Mickleton Tunnel portal. Two drawings on one sheet. Drawing No. 8 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan under coping with plan of superstructure.

11/3/46, 11:00 PM

Details of Bridge. Six drawings on one sheet. Drawing No. 5 for Mickleton Tunnel Contract. First drawing is of an elevation, second drawing is of plan of foundations and plan of superstructure, third drawing is of longitudinal section at AB, fourth drawing is of sections at E, F and G, fifth drawing is of transverse section at CD, sixth drawing is of side elevation. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Details of Culverts. Twenty drawings on one sheet. Drawing No. 11 for Mickleton Tunnel Contract. Drawings include elevations, transverse sections, longitudinal sections and plan of foundations and plan of superstructure for different sized culverts.

11/3/46, 11:00 PM

Land plan of Mickleton Tunnel. Drawing No. 1 for Mickleton Tunnel Contract. Drawing is of the route of the line passing through parish of Weston Subedge, parish of Chipping Campden and hamlet of Broad Campden. Drawing is signed by William Williams, Samuel Ackroyd, Daniel Price and Brunel.

11/3/46, 11:00 PM

Powered by Preservica
Copyright © Network Rail