075 - Bristol and Exeter Railway Contract 4C

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Four drawings on one sheet. Drawing No. 5 for Contract No. 4C. First drawing is of an elevation, second drawing is of section at EF, third drawing is of section on square, fourth drawing is of plan of foundations with plan of superstructure. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841

Two drawings on one sheet. First drawing is of a cross section of an embankment, second drawing is of a cross section of diversion of River Tone.

05 June 1841

Three drawings on one sheet of River Tone Bridge. First drawing is of an elevation, second drawing is of longitudinal section, third drawing is of plan of foundations at EF with plan of superstructure.

July 1842

Four drawings on one sheet. Drawing No. 4 for Contract No. 4C. First drawing is of an elevation, second drawing is of a section, third drawing is of a plan of superstructure and foundations, fourth drawing is of longitudinal section. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841

One contract between the Bristol and Exeter Railway Company and Samuel Bromhead dated 1841.

1841

Two drawings on one sheet. Drawing No. 3 for Contract No. 4C. First drawing is of embankment No. 1, second drawing is of embankment No. 2. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841

Drawing No. 2 for Contract No. 4C. Drawing is of a cross section of the land showing the route of the line in Contract No. 4C. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841

Four drawings on one sheet. Drawing No. 6 for Contract No. 4C. First drawing is of an elevation, second drawing is of section at AB, third drawing is of plan of superstructure with plan of foundations, fourth drawing is of section at EF. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841

Drawing No. 1 for Contract No. 4C. Drawing is of a plan of the route of the line through the parish of West Monkton. This is one of the drawings referred to in the contract between the Bristol and Exeter Railway Company and Mr. Samuel Bromhead made the day of one thousand eight hundred and forty one. Drawing is signed by Samuel Bromhead and Brunel.

1841