Object Type: Folder
In Folder: Historical Engineering Collection
Seven drawings on one sheet. First drawing is of cutting no. 1, second drawing is of cutting no. 2, third drawing is of cutting no. 5, fourth drawing is of cutting no. 3, fifth drawing is of cutting no. 7, sixth drawing is of surface forming no. 4, seventh drawing is of cutting in stone no. 6. Signed by C J Gregory at Bath, May 12th 184[-].
1/1/45, 12:00 AM
Seven drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F, G and H, third drawing is of longitudinal section at A.B, fourth drawing is of plan, fifth drawing is of transverse section at C.D, sixth drawing is of plan of superstructure and plan of foundations, seventh drawing is of end elevation.
1/1/45, 12:00 AM
Seven drawings on one sheet. First drawing is of elevation, second drawing is of section at C.D, third drawing is of plan of superstructure and plan of foundations, fourth drawing is of end view of wing wall, fifth drawing is of plan, sixth drawing is of section A.B, seventh drawing is of end elevation.
2/6/48, 12:00 AM
Six drawings on one sheet. First drawing is of elevation, second drawing is of section at C.D, third drawing is of section at A.B, fourth drawing is of plan of superstructure, fifth drawing is of plan, sixth drawing is of plan of foundations.
6/12/49, 12:00 AM
Twelve drawings on one sheet. First drawing is of casting at R, second drawing is of cross section at E.F, third drawing is of longitudinal section at C.D, fourth drawing is of casting at K, fifth drawing is of casting at N, sixth drawing is of plan, seventh drawing is of casting at O, eighth drawing is of casting at L, ninth drawing is of casting at K, tenth drawing is of casting at P, eleventh drawing is of cross section at G.H, twelfth drawing is of longitudinal section at A.B.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of sections at E, F and G, third drawing is of longitudinal section at A.B, fourth drawing is of plan, fifth drawing is of sections at E, F, G and H, sixth drawing is of plan of superstructure and plan of foundations, seventh drawing is of end elevation, eighth drawing is of transverse section at C.D.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of side elevation, third drawing is of plan, fourth drawing is of end view of wing wall at E, fifth drawing is of end view of wing wall at F, sixth drawing is of section at A.B, seventh drawing is of section at C.D, eighth drawing is of plan of foundations and plan of superstructure.
1/1/45, 12:00 AM
Six drawings on one sheet. First drawing is of section at H.I, second drawing is of end elevation, third drawing is of plan, fourth drawing is of side truss and middle truss, fifth drawing is of details, sixth drawing is of wrought iron plate at L.
1/1/45, 12:00 AM
Five drawings on one sheet. First drawing is of plan, second drawing is of elevation, third drawing is of plan, fourth drawing is of plan, fifth drawing is of plan.
1/1/45, 12:00 AM
Seven drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section, third drawing is of plan, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of section at E.F, sixth drawing is of transverse section at A.B, seventh drawing is of end elevation.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of [plan], fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of end view of wing wall at E, sixth drawing is of end view of wing wall at F, seventh drawing is of transverse section at C.D, eighth drawing is of end elevation.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of sections at E.F, sixth drawing is of section at G.H, seventh drawing is of transverse section at C.D, eighth drawing is of end elevation.
1/1/45, 12:00 AM
Six drawings on one sheet. First drawing is of elevation, second drawing is of section at A.B, third drawing is of plan, fourth drawing is of section at C.D, fifth drawing is of plan of superstructure and plan of foundations, sixth drawing is of sections at E, F and G.
1/1/45, 12:00 AM
Five drawings on one sheet. First drawing is of cutting cross section no. 1, second drawing is of embankment cross section no. 2, third drawing is of surface forming, fourth drawing is of cutting cross section no. 3, fifth drawing is of cutting cross section no. 3.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of section at E, sixth drawing is of sections at F.G, seventh drawing is of transverse section at C.D, eighth drawing is of end elevation.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan, fifth drawing Is of plan of superstructure and plan of foundations, sixth drawing is of section at E, F and G, seventh drawing is of transverse section at C.D, eighth drawing is of end elevation.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of longitudinal section at A.B, third drawing is of plan, fourth drawing is of plan of superstructure and plan of foundations, fifth drawing is of end view of wing walls, sixth drawing is of plan, seventh drawing is of transverse section at C.D, eighth drawing is of side elevation.
1/1/45, 12:00 AM
Eight drawings on one sheet. First drawing is of elevation, second drawing is of sections at G,F, E, I, J, K and H, third drawing is of side elevation, fourth drawing is of section at C.D, fifth drawing is of section at A.B, sixth drawing is of [plan], seventh drawing is of plan of foundation and plan of superstructure, eighth drawing is of elevation.
1/1/45, 12:00 AM