search archive
browse archive Up

040 - Great Western Railway Contract 3C

Object Type: Folder
In Folder: Historical Engineering Drawings


View Gallery

Title
Description
Date

Long section of line. Drawing is of a cross section of the land for the proposed line between Lane Bridge and Foot Culvert Drawing No. 6. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Details of Culvert. Four drawings of a tunnel on one sheet. Drawing No. 6 for Contract No. 3C. First drawing is of an elevation, second drawing is of longitudinal section and back elevation at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Details of Green Bridge. Four drawings on one sheet. Drawing No. 4 for Contract No. 3C. First drawing is of an elevation and a longitudinal section at AB, second drawing is of elevation at CD, third drawing is of a plan of foundations with plan of superstructure, fourth drawing is of transverse section at EF. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Details of cutting and embankment. Two drawings on one sheet. Drawing No. 3 for Contract No. 3C. First drawing is of cross section of cutting, second drawing is of cross section of embankment. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Details of Culverts. Twelve drawings on one sheet. Drawing No. 9 for Contract No. 3C. First drawing is of an elevation, second drawing is of a transverse section at CD, third drawing is of an elevation, fourth drawing is of transverse section at CD, fifth drawing is of an elevation, sixth drawing is of a transverse section at CD, seventh drawing is of a plan, eighth drawing is of longitudinal section at AB, ninth drawing is of a plan, tenth drawing is of longitudinal section at AB, eleventh drawing is of a plan, twelfth drawing is of longitudinal section at AB. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Plan of the line. Drawing No. 1 for Contract No. 3C. Drawing is of the proposed line between Langley Burrell parish, Draycott parish and Sutton Benger parish. This is one of the drawings referred to in the annexed contract between the Great Western Railway Company and Mr. Edward Price bearing date the seventeenth day of June 1839. Drawing is signed by Edward Price and Brunel.

6/16/39, 11:00 PM

Original Drawing on paper in ink and colour wash

6/16/39, 11:00 PM

Powered by Preservica
Copyright © Network Rail