045 - Great Western Railway Pangbourn Contract

Object Type: Folder
In Folder: Historical Engineering Drawings


View Gallery

Title
Description
Date

Details of bridge. Five drawings on one sheet. Drawing No. 7 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of an archway over stream. Four drawings on one sheet. Drawing No. 15 for Pangbourn Contract. First drawing is of an elevation, second drawing is of transverse section at AB, third drawing is of a plan, fourth drawing is of longitudinal section at CD.

9/7/38, 11:00 PM

Details of bridge No. 56 Purley. Five drawings on one sheet. Drawing No. 8 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

9/7/38, 11:00 PM

Details of culvert. Four drawings on one sheet. Drawing No. 15 for Pangbourn Contract. First drawing is of an elevation, second drawing is of transverse section at AB, third drawing is of a plan, fourth drawing is of longitudinal section at CD. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 11 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of embankments. Three drawings on one sheet of embankments. Drawing No. 4 for Pangbourn Contract. First drawing is of Cross section No. 1, second drawing is of Cross section No.2, third drawing is of Cross section No. 3. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of cutting. Four drawings on one sheet. Drawing No. 3 for Pangbourn Contract. First drawing is of cross section No. 2, second drawing is of cross section No. 1, third drawing is of cross section No. 3, fourth drawing is of cross section No. 4.

9/7/38, 11:00 PM

Details of cutting. Four drawings on one sheet of cuttings. Drawing No. 3 for Pangbourn Contract. First drawing is of cross section No. 2, second drawing is of Cross section No. 1, third drawing is of Cross section No. 3, fourth drawing is of Cross section No. 4. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of bridge No. 46 Pangbourn. Five drawings on one sheet. Drawing No. 10 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

9/7/38, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 6 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

9/7/38, 11:00 PM

Details of bridge. Five drawings on one sheet. Drawing No. 9 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of bridge over Turnpike Road No. 27 Pangbourn. Five drawings on one sheet. Drawing No. 12 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

9/7/38, 11:00 PM

Details of bridge. Two drawings on one sheet. Drawing No. 14 for Pangbourn Contract. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure.

9/7/38, 11:00 PM

Details of bridge. Six drawings on one sheet. Drawing No. 5 for Pangbourn Contract. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, sixth drawing is of back elevation at HI. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of bridge. Two drawings on one sheet. Drawing No. 14 for Pangbourn Contract. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

9/7/38, 11:00 PM

Details of cutting. Four drawings on one sheet. Drawing No. 3 for Pangbourn Contract. First drawing is of cross section No. 2, second drawing is of cross section No. 1, third drawing is of cross section No. 3, fourth drawing is of cross section No. 4.

9/7/38, 11:00 PM

Details of occupation bridge between Bassildon and Pangbourn. Six drawings on one sheet. Drawing No. 13 for Pangbourn Contract. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, sixth drawing is of back elevation.

9/7/38, 11:00 PM

Details of culverts. Four drawings on one sheet. Drawing No. 16 for Pangbourn Contract. First drawing is of an elevation, second drawing is of transverse section at AB, third drawing is of a plan, fourth drawing is of longitudinal section at CD.

9/7/38, 11:00 PM

Powered by Preservica