045 - Great Western Railway Pangbourn Contract

Object Type: Folder
In Folder: Historical Engineering Collection


View Gallery

Title
Description
Date

Details of bridge. Six drawings on one sheet. Drawing No. 5 for Pangbourn Contract. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, sixth drawing is of back elevation at HI. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of bridge. Five drawings on one sheet. Drawing No. 6 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

08 September 1838

Indenture between Thomas Grissell and Samuel Morton Peto and the Great Western Railway Company for contracts for works on the Great Western Railway.

08 September 1838

Details of bridge. Two drawings on one sheet. Drawing No. 14 for Pangbourn Contract. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of culverts. Four drawings on one sheet. Drawing No. 16 for Pangbourn Contract. First drawing is of an elevation, second drawing is of transverse section at AB, third drawing is of a plan, fourth drawing is of longitudinal section at CD.

08 September 1838

One drawing on sheet showing [plan].

1835-1845

Details of bridge No. 46 Pangbourn. Five drawings on one sheet. Drawing No. 10 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

08 September 1838

Details of bridge over road No. 26 in the Parish of Tilehurst. Six drawings on one sheet. Drawing No. 5 for Pangbourn Contract. First drawing is of an elevation, second drawing is of plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, fifth drawing is of back elevation.

08 September 1838

Details of bridge over Turnpike Road No. 27 Pangbourn. Five drawings on one sheet. Drawing No. 12 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

08 September 1838

Details of an archway over stream. Four drawings on one sheet. Drawing No. 15 for Pangbourn Contract. First drawing is of an elevation, second drawing is of transverse section at AB, third drawing is of a plan, fourth drawing is of longitudinal section at CD.

08 September 1838

Details of bridge No. 56 Purley. Five drawings on one sheet. Drawing No. 8 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

08 September 1838

Details of bridge. Five drawings on one sheet. Drawing No. 10 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of bridge. Three drawings on one sheet. Drawing No. 14A for Pangbourn Contract. First drawing is of longitudinal section at AB, second drawing is of transverse section at CD, third drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of bridge No. 40 Pangbourn. Five drawings on one sheet. Drawing No. 11 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF.

08 September 1838

Details of bridge. Five drawings on one sheet. Drawing No. 8 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of occupation bridge between Bassildon and Pangbourn. Six drawings on one sheet. Drawing No. 13 for Pangbourn Contract. First drawing is of an elevation, second drawing is of a plan of foundations with plan of superstructure, third drawing is of transverse section at AB, fourth drawing is of sections at C, D and E, fifth drawing is of longitudinal section at FG, sixth drawing is of back elevation.

08 September 1838

Details of bridge. Five drawings on one sheet. Drawing No. 9 for Pangbourn Contract. First drawing is of an elevation, second drawing is of longitudinal section at AB, third drawing is of transverse section at CD, fourth drawing is of plan of foundations with plan of superstructure, fifth drawing is of transverse section at EF. Drawing is signed by Brunel, Thomas Grissell and Samuel Morton Peto.

08 September 1838

Details of cutting. Four drawings on one sheet. Drawing No. 3 for Pangbourn Contract. First drawing is of cross section No. 2, second drawing is of cross section No. 1, third drawing is of cross section No. 3, fourth drawing is of cross section No. 4.

08 September 1838